Geographical condition prediction
First Claim
1. A location condition forecasting virtual simulation and presentation improvement method comprising:
- receiving in real time from a user in a specified location, by a computer processor of a computing system, a specified future timeframe associated with a future condition of said specified location;
simultaneously retrieving, by said computer processor from a database, multiple condition data sets associated with at least one element of said specified location, wherein said one element comprises a construction project associated with said specified location;
simultaneously retrieving in realtime, by said computer processor from a plurality of video retrieval apparatuses, a realtime video stream comprising images of differing portions of said specified location;
retrieving in realtime, by said computer processor from a plurality of sensors, sensor readings associated with physical conditions of said specified location, wherein said sensor reading comprise readings indicating heat conditions, light conditions, sound conditions, pressure conditions, magnetism conditions, and motion conditions associated with said specified location;
identifying, by said computer processor based on said realtime video stream and said sensor readings, realtime conditions associated with said construction project;
selecting, by said computer processor, a best fit polynomial equation associated with predicting a future condition of said at least one element;
simultaneously calculating, by said computer processor executing said best fit polynomial equation with respect to said realtime video stream, said sensor readings, said multiple condition data sets, and said specified future timeframe, condition score values associated with future conditions of said at least one element;
calculating, by said computer processor, an overall condition score value associated with said condition score values, wherein said overall condition score value comprises an aggregated weighted average of said condition score values;
presenting, by said computer processor to a user, said overall condition score value;
simulating, by said processor, changes to said construction project based on said condition score values, said realtime video stream, and said sensor readings;
virtually presenting, by said processor to said user, said simulated changes to said construction project; and
enabling, by said processor based on said simulating and in response to said virtually presenting, improvements to said construction project.
2 Assignments
0 Petitions
Accused Products
Abstract
A method and system for forecasting the conditions of locations is provided. The method includes receiving in real time from a user in a specified location, a specified future timeframe associated with a future condition of the specified location. Multiple condition data sets associated with an element of the specified location are simultaneously retrieved and a best fit polynomial equation associated with predicting a future condition of the element is selected. Condition score values associated with future conditions of the element are calculated. An overall condition score value associated with an aggregation of individual condition score values is calculated and presented.
6 Citations
20 Claims
-
1. A location condition forecasting virtual simulation and presentation improvement method comprising:
-
receiving in real time from a user in a specified location, by a computer processor of a computing system, a specified future timeframe associated with a future condition of said specified location; simultaneously retrieving, by said computer processor from a database, multiple condition data sets associated with at least one element of said specified location, wherein said one element comprises a construction project associated with said specified location; simultaneously retrieving in realtime, by said computer processor from a plurality of video retrieval apparatuses, a realtime video stream comprising images of differing portions of said specified location; retrieving in realtime, by said computer processor from a plurality of sensors, sensor readings associated with physical conditions of said specified location, wherein said sensor reading comprise readings indicating heat conditions, light conditions, sound conditions, pressure conditions, magnetism conditions, and motion conditions associated with said specified location; identifying, by said computer processor based on said realtime video stream and said sensor readings, realtime conditions associated with said construction project; selecting, by said computer processor, a best fit polynomial equation associated with predicting a future condition of said at least one element; simultaneously calculating, by said computer processor executing said best fit polynomial equation with respect to said realtime video stream, said sensor readings, said multiple condition data sets, and said specified future timeframe, condition score values associated with future conditions of said at least one element; calculating, by said computer processor, an overall condition score value associated with said condition score values, wherein said overall condition score value comprises an aggregated weighted average of said condition score values; presenting, by said computer processor to a user, said overall condition score value; simulating, by said processor, changes to said construction project based on said condition score values, said realtime video stream, and said sensor readings; virtually presenting, by said processor to said user, said simulated changes to said construction project; and enabling, by said processor based on said simulating and in response to said virtually presenting, improvements to said construction project. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8)
-
-
9. A computing system comprising a computer processor coupled to a computer-readable memory unit, said memory unit comprising instructions that when executed by the computer processor implements a location condition forecasting virtual simulation and presentation improvement method comprising:
-
receiving in real time from a user in a specified location, by said computer processor, a specified future timeframe associated with a future condition of said specified location; simultaneously retrieving, by said computer processor from a database, multiple condition data sets associated with at least one element of said specified location, wherein said one element comprises a construction project associated with said specified location; simultaneously retrieving in realtime, by said computer processor from a plurality of video retrieval apparatuses, a realtime video stream comprising images of differing portions of said specified location; retrieving in realtime, by said computer processor from a plurality of sensors, sensor readings associated with physical conditions of said specified location, wherein said sensor reading comprise readings indicating heat conditions, light conditions, sound conditions, pressure conditions, magnetism conditions, and motion conditions associated with said specified location; identifying, by said computer processor based on said realtime video stream and said sensor readings, realtime conditions associated with said construction project; selecting, by said computer processor, a best fit polynomial equation associated with predicting a future condition of said at least one element; simultaneously calculating, by said computer processor executing said best fit polynomial equation with respect to said realtime video stream, said sensor readings, said multiple condition data sets, and said specified future timeframe, condition score values associated with future conditions of said at least one element; calculating, by said computer processor, an overall condition score value associated with said condition score values, wherein said overall condition score value comprises an aggregated weighted average of said condition score values; presenting, by said computer processor to a user, said overall condition score value; simulating, by said processor, changes to said construction project based on said condition score values, said realtime video stream, and said sensor readings; virtually presenting, by said processor to said user, said simulated changes to said construction project; and enabling, by said processor based on said simulating and in response to said virtually presenting, improvements to said construction project. - View Dependent Claims (10, 11, 12, 13, 14, 15)
-
-
16. A computer program product, comprising a computer readable hardware storage device storing a computer readable program code, said computer readable program code comprising an algorithm that when executed by a computer processor of a computing system implements a location condition forecasting virtual simulation and presentation improvement method, said method comprising:
-
receiving in real time from a user in a specified location, by said computer processor, a specified future timeframe associated with a future condition of said specified location; simultaneously retrieving, by said computer processor from a database, multiple condition data sets associated with at least one element of said specified location, wherein said one element comprises a construction project associated with said specified location; simultaneously retrieving in realtime, by said computer processor from a plurality of video retrieval apparatuses, a realtime video stream comprising images of differing portions of said specified location; retrieving in realtime, by said computer processor from a plurality of sensors, sensor readings associated with physical conditions of said specified location, wherein said sensor reading comprise readings indicating heat conditions, light conditions, sound conditions, pressure conditions, magnetism conditions, and motion conditions associated with said specified location; identifying, by said computer processor based on said realtime video stream and said sensor readings, realtime conditions associated with said construction project selecting, by said computer processor, a best fit polynomial equation associated with predicting a future condition of said at least one element; simultaneously calculating, by said computer processor executing said best fit polynomial equation with respect to said realtime video stream, said sensor readings, said multiple condition data sets, and said specified future timeframe, condition score values associated with future conditions of said at least one element; calculating, by said computer processor, an overall condition score value associated with said condition score values, wherein said overall condition score value comprises an aggregated weighted average of said condition score values; presenting, by said computer processor to a user, said overall condition score value; simulating, by said processor, changes to said construction project based on said condition score values, said realtime video stream, and said sensor readings; virtually presenting, by said processor to said user, said simulated changes to said construction project; and enabling, by said processor based on said simulating and in response to said virtually presenting, improvements to said construction project. - View Dependent Claims (17, 18, 19, 20)
-
Specification