×

Method and apparatus for controlling the operation of a stump cutter

  • US 10,039,239 B2
  • Filed: 07/29/2008
  • Issued: 08/07/2018
  • Est. Priority Date: 07/31/2007
  • Status: Active Grant
First Claim
Patent Images

1. A controller system for a stump cutter having three operator control handles, comprising:

  • (a) a capacitive sensor mounted in each of first, second and third operator control handles, each operator control handle being configured for selectively controlling movement of a stump cutter in respective first, second and third directions in response to movement of the respective handle by an operator, each of the capacitive sensors arranged and configured to change capacitance when the respective operator control handle is touched by the operator;

    (b) an operator presence circuit connected to each of the capacitive sensors, the circuit having a node where changes in capacitance of the capacitive sensors can be measured as a change in voltage; and

    (c) a controller connected to the operator presence circuit, the controller receiving the changes in voltage from the operator presence circuit and in response to the received voltage change indicating that each of the three operator control handles is no longer being touched by the operator, the controller including a computer with a memory storing software instructions that configure the controller to initiate a predetermined delay period only when the voltage change indicates that each of the three operator control handles is no longer being touched by the operator, during which predetermined delay period the stump cutter is configured to operate as if the operator were touching at least one of the three operator control handles;

    wherein the controller is configured to issue a signal to stop the stump cutter following the delay period if the voltage change indicates that each of the three operator control handles is no longer being touched by the operator during the delay period; and

    wherein the controller is configured to initiate a grace period following the delay period, and if the voltage change indicates that at least one of the three operator control handles is touched by the operator during the grace period, the controller is configured to resume operation of the stump cutter.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×