×

Power line management system

  • US 10,041,968 B2
  • Filed: 10/14/2016
  • Issued: 08/07/2018
  • Est. Priority Date: 02/14/2012
  • Status: Active Grant
First Claim
Patent Images

1. A method, comprising:

  • obtaining, using a first sensor unit coupled to a first power line in a power distribution system, at least one first measurement of at least one inertial property of the first power line;

    obtaining, using a second sensor unit different from the first sensor unit and coupled to a second power line different from the first power line, at least a second measurement of at least one inertial property of the second power line;

    detecting a weather condition affecting multiple power lines in an area at least in part by correlating a first feature obtained from the at least one first measurement with a second feature obtained from the at least one second measurement;

    scheduling maintenance on at least one of the multiple power lines in response to detecting the weather condition; and

    ,performing maintenance on at least one of the multiple power lines in response to detecting the weather condition.

View all claims
  • 2 Assignments
Timeline View
Assignment View
    ×
    ×