Analytics for consumer power consumption
First Claim
Patent Images
1. A power utility management system comprising:
- a processor configured to;
receive power consumption data from a first customer premises, the power consumption data comprising individual power consumption data of a plurality of devices at the first customer premises;
analyze the power consumption data of each of the devices at the first customer premises;
compare the analyzed data of a first device among the devices at the first customer premises with data of a second device from a second customer premises; and
generate and send a command to change operation of the first device at the first customer premises, the command generated based on the comparison, and sent to the first customer premises to change operation of the first device to match power consumption of the first customer premises with power consumption of the second customer premises.
4 Assignments
0 Petitions
Accused Products
Abstract
A system and method for centralized statistical analysis and control of power consumption is provided. The centralized statistical analysis, performed by a centralized power utility management system, may then be compared with one or more goals of the customer. Based on the comparison of the statistical analysis with the one or more goals of the customer, one or more actions may be taken including controlling one or more appliances resident at the customer premises.
-
Citations
20 Claims
-
1. A power utility management system comprising:
a processor configured to; receive power consumption data from a first customer premises, the power consumption data comprising individual power consumption data of a plurality of devices at the first customer premises; analyze the power consumption data of each of the devices at the first customer premises; compare the analyzed data of a first device among the devices at the first customer premises with data of a second device from a second customer premises; and generate and send a command to change operation of the first device at the first customer premises, the command generated based on the comparison, and sent to the first customer premises to change operation of the first device to match power consumption of the first customer premises with power consumption of the second customer premises. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10)
-
11. A method comprising:
-
receiving, via an interface, first load data comprising individual load data of each of a plurality of first devices, the first devices being at a first location; and receiving, via the interface, second load data comprising individual load data of each of a plurality of second devices, the second devices being at the second location, wherein the second location is different from the first location, and the first devices are comparable with the second devices; comparing individual load data of a device from the first location with individual load data of a device from the second location; and transmitting instructions to reconfigure operation of the device from the first location based on the comparison to match the first load data with the second load data. - View Dependent Claims (12, 13, 14, 15, 16)
-
-
17. A non-transitory computer readable storage medium comprising instructions executable by one or more processors, the instructions comprising:
-
instructions to receive individual load data from multiple electric devices at a first premises, and individual load data from multiple electric devices at a second premises; instructions to independently transmit the individual load data from the multiple electric devices at the first premises and the individual load data from the multiple electric devices at the second premises over a communication network; instructions to receive, from over the communication network, in response to the transmitted individual load data from the multiple electric devices at the first and second premises, a reconfiguration of a load of the multiple electric devices at the first premises to match a load of the multiple electric devices at the second premises, wherein the reconfiguration comprises a setting applicable to at least one of the multiple electric devices at the first premises; and instructions to control operation of the multiple electric devices at the first premises according to the received settings. - View Dependent Claims (18, 19, 20)
-
Specification