×

Void reducing asphalt membrane composition, method and apparatus for asphalt paving applications

  • US 10,060,080 B2
  • Filed: 07/11/2017
  • Issued: 08/28/2018
  • Est. Priority Date: 03/09/2015
  • Status: Active Grant
First Claim
Patent Images

1. A method of reducing air voids in a discrete portion of an asphalt pavement which comprises:

  • providing an asphalt membrane composition that comprises;

    an asphalt binder,an elastomeric polymer,a wax modifier, andat least one of fumed silica or fumed alumina;

    applying a discrete band of the asphalt membrane composition on a surface to be paved with a hot mix asphalt;

    paving over the surface and discrete band of asphalt membrane composition with a hot mix asphalt to form a pavement; and

    allowing the asphalt membrane composition to migrate into the hot mix asphalt and reduce air voids in the pavement by migrating into the hot mix asphalt.

View all claims
  • 2 Assignments
Timeline View
Assignment View
    ×
    ×