Method of and system for drilling information management and resource planning
First Claim
1. A method for executing a directional-drilling project, the method comprising:
- storing, on a database, drilling-project data;
transferring, via a wireless protocol, the drilling-project data to a hand-held second computer;
uploading, via a barcode scanner on the second computer, equipment information to the hand-held second computer;
determining, via the second computer, calibration data, the calibration data comprising a difference between a magnetic azimuth and a grid azimuth;
transferring, via the wireless protocol, the calibration data from the hand-held second computer to a first computer;
executing, via the first computer, the directional-drilling project;
recording, via the second computer, parameters related to the directional-drilling project, the parameters comprising at least one of consumables used, equipment service time, activities during a shift, a notification of equipment problems, and a notification of drilling problems; and
utilizing the parameters to determine at least one of diagnostic information, borehole design assistance, drilling problem assistance, and equipment problem assistance.
2 Assignments
0 Petitions
Accused Products
Abstract
In one aspect, the present invention relates to a drilling-information-management system. The drilling-information management system includes a probe assembly disposed on a drill rod, a first computer interoperably coupled to the probe assembly via a conductor disposed in a drill rod, and a second computer in communication with the first computer. The second computer includes a barcode scanner. The drilling-information management system includes a database in communication with the second computer. Drilling-project data is transferred from the database to the second computer and calibration data is transferred from the second computer to the first computer. The first computer executes a drilling plan according to the drilling-project data.
16 Citations
20 Claims
-
1. A method for executing a directional-drilling project, the method comprising:
-
storing, on a database, drilling-project data; transferring, via a wireless protocol, the drilling-project data to a hand-held second computer; uploading, via a barcode scanner on the second computer, equipment information to the hand-held second computer; determining, via the second computer, calibration data, the calibration data comprising a difference between a magnetic azimuth and a grid azimuth; transferring, via the wireless protocol, the calibration data from the hand-held second computer to a first computer; executing, via the first computer, the directional-drilling project; recording, via the second computer, parameters related to the directional-drilling project, the parameters comprising at least one of consumables used, equipment service time, activities during a shift, a notification of equipment problems, and a notification of drilling problems; and utilizing the parameters to determine at least one of diagnostic information, borehole design assistance, drilling problem assistance, and equipment problem assistance. - View Dependent Claims (2, 3, 4, 5, 6)
-
-
7. A method of managing a drilling project, the method comprising:
-
storing, on a database, drilling-project data; compiling, via the database, drilling-requirements data; transferring, via a wireless protocol, the drilling-requirements data to a drilling-management entity; transferring the drilling-project data to a hand-held second computer via the wireless protocol; uploading, via a barcode scanner on the hand-held second computer, equipment information to the hand-held second computer; determining, via the second computer, calibration data, the calibration data comprising a difference between a magnetic azimuth and a grid azimuth; transferring, via the wireless protocol, the calibration data from the hand-held second computer to a first computer; executing, via the first computer, a drilling plan utilizing the drilling-project data; recording, via the second computer, parameters related to the directional-drilling project, the parameters comprising at least one of consumables used, equipment service time, a list of activities performed during a shift, a notification of equipment problems, and a notification of drilling problems; and utilizing the parameters to determine at least one of diagnostic information, borehole design assistance, drilling problem assistance, and equipment problem assistance. - View Dependent Claims (8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19)
-
-
20. A drilling-information-management system comprising:
-
a probe assembly disposed on a drill string; a first computer interoperably coupled to the probe assembly via the drill string, the drill string comprising a drill rod; a conductor disposed within the drill rod, wherein electrical signals are transmitted between the probe assembly and the first computer via the conductor; a hand-held second computer in communication with the first computer, the second computer comprising a barcode scanner and operable to store calibration data, wherein calibration data is transferred from the second computer to the first computer via a wireless protocol; a database interoperably coupled with the second computer via the wireless protocol, wherein drilling-project data is transferred from the database to the second computer via the wireless protocol; and wherein the first computer executes a drilling plan according to the drilling-project data.
-
Specification