Apparatus for calculating operational time of hybrid construction machine and method therefor
First Claim
1. A hybrid construction machine comprising;
- an engine;
a generator connected to the engine;
a converter connected to the generator, and an electrical storage system (“
ESS”
) connected to the converter, a converter current detector that is positioned between the converter and the generator and detects a current flowing from the generator to the converter and from the converter to the generator;
an ESS current detector that is positioned between the converter and the ESS, anddetects the current flowing from the converter to the ESS and from the ESS to the converter; and
a processing unit that receives the currents detected by the converter current detector as well as the ESS current detector, and calculates an operation time of a respective component;
wherein the processing unit sets the current level of ‘
a’
as a current level that is generated by an electric line noise and an error, andwhen RMS (Root Mean Square) value of the current detected by the converter current detector is more than 0+a,the processing unit recognizes that the converter is under operation and counts the operation time of the converter; and
wherein the processing unit sets the current level of ‘
a* as a current level that is generated by said electric line noise and said error, andwhen said RMS (Root Mean Square) value of the current detected by the ESS current detector is more than 0+a, the processing unit recognizes that the ESS is under operation and counts the operation time of the ESS”
.
1 Assignment
0 Petitions
Accused Products
Abstract
A hybrid construction machine is disclosed, which comprises an engine, a generator, the generator connected to the engine, a converter connected to the generator, and an ESS (Energy Storage System) connected to the converter. The hybrid construction machine further comprises a converter current detector positioned either between the converter and the generator or between the converter and the ESS to detect the current flowing between the converter and the generator, an ESS current detector positioned between the converter and the ESS to detect the current flowing between the converter and the ESS, a processing unit receiving the current detected from the converter current detector and the ESS current detector and calculating the operation time of the respective component, and a display unit displaying the operation time of the respective component. Since the hybrid construction machine calculates the operation time of the respective component and displays the same to an operator.
-
Citations
10 Claims
-
1. A hybrid construction machine comprising;
-
an engine; a generator connected to the engine; a converter connected to the generator, and an electrical storage system (“
ESS”
) connected to the converter, a converter current detector that is positioned between the converter and the generator and detects a current flowing from the generator to the converter and from the converter to the generator;an ESS current detector that is positioned between the converter and the ESS, and detects the current flowing from the converter to the ESS and from the ESS to the converter; and a processing unit that receives the currents detected by the converter current detector as well as the ESS current detector, and calculates an operation time of a respective component; wherein the processing unit sets the current level of ‘
a’
as a current level that is generated by an electric line noise and an error, andwhen RMS (Root Mean Square) value of the current detected by the converter current detector is more than 0+a, the processing unit recognizes that the converter is under operation and counts the operation time of the converter; and wherein the processing unit sets the current level of ‘
a* as a current level that is generated by said electric line noise and said error, andwhen said RMS (Root Mean Square) value of the current detected by the ESS current detector is more than 0+a, the processing unit recognizes that the ESS is under operation and counts the operation time of the ESS”
. - View Dependent Claims (2, 7, 8)
-
-
3. A hybrid construction machine comprising:
-
an engine, a generator connected to the engine, a converter connected to the generator, a ESS connected to the converter, an electric motor connected to an inverter; an inverter current detector that is positioned between the inverter and the electric motor, and detects a current flowing from the electric motor to the inverter and from the inverter to the electric motor; and a processing unit that receives the current detected by the inverter current detector, and calculates an operation time of a respective component; wherein the processing unit sets the current level of ‘
a’
as a current level that is generated by an electric line noise and an error, and when RMS (Root Mean Square) value of the current detected by the inverter current detector is more than 0+a, the processing unit recognizes that the inverter is under operation and counts the operation times of the inverter, the electric motor and a gear unit. - View Dependent Claims (4, 9)
-
-
5. A hybrid construction machine comprising:
an engine, a generator connected to the engine, a converter connected to the generator, an electrical storage system (“
ESS”
) connected to the converter,at least one of inverters connected to the ESS; at least one of electric motors connected respectively to the inverter; hydraulic pumps connected respectively to the electric motor; cylinders, each of which is connected to and driven by one of the hydraulic pumps; at least one of the inverter current detectors that are positioned between the at least one of the inverters and the at least one of the electric motors, respectively, and detect a current flowing from the respective electric motor to the respective inverter and from the respective inverter to the respective electric motor; and a processing unit that receives the current detected from the inverter current detector and calculates an operation time of a respective component; wherein the processing unit sets the current level of ‘
a’
as a current level that is generated by an electric line noise and an error, and when RMS (Root Mean Square) value of the current detected by the inverter current detector is more than 0+a, the processing unit recognizes that the inverter is under operation and counts the operation times of the inverter, the electric motor, the hydraulic pumps and the cylinders.- View Dependent Claims (6, 10)
Specification