×

Building control systems with optimization of equipment life cycle economic value while participating in IBDR and PBDR programs

  • US 10,222,083 B2
  • Filed: 08/25/2016
  • Issued: 03/05/2019
  • Est. Priority Date: 10/08/2015
  • Status: Active Grant
First Claim
Patent Images

1. A central plant configured to generate and provide resources to a building, the central plant comprising:

  • an electrical energy storage subplant configured to store electrical energy purchased from a utility and to discharge the stored electrical energy;

    a plurality of generator subplants configured to consume one or more input resources comprising the discharged electrical energy and to generate one or more output resources to satisfy a resource demand of the building; and

    a controller configured to determine, for each time step within a time horizon, an optimal allocation of the input resources and the output resources for each of the subplants in order to optimize a total monetary value of operating the central plant over the time horizon;

    wherein the controller determines the optimal allocation of the input resources and the output resources by optimizing a value function comprising a monetized cost of capacity loss for the electrical energy storage subplant predicted to result from battery degradation due to a potential allocation of the resources;

    wherein the controller predicts the monetized cost of capacity loss prior to allocating the resources, uses the predicted cost of capacity loss to optimize the allocation of the input resources and the output resources, and uses the optimal allocation of the input resources and the output resources to operate each of the subplants.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×