Discrete resource management

  • US 10,223,167 B2
  • Filed: 04/24/2009
  • Issued: 03/05/2019
  • Est. Priority Date: 04/24/2009
  • Status: Active Grant
First Claim
Patent Images

1. A system that facilitates discrete resource management, comprising:

  • at least one processor coupled to memory retaining instructions carried out by the at least one processor, in operation, for;

    a collection component that, in operation, obtains a plurality of process-related resource data elements from a plurality of autonomous sensor components disposed at a plurality of locations within an industrial environment, wherein each process-related resource data element comprises a value quantifying a water consumption, an energy consumption, or both of one of a plurality of defined processes of the industrial environment, wherein each of the plurality of defined processes is configured to contribute to production of a product;

    a marking component that, in operation, associates each of the plurality of process-related resource data elements with descriptive data, wherein the descriptive data comprises environmental conditions, a rate of production, a duration of production, or any combination thereof for at least one manufacturing process of the plurality of defined processes configured to contribute to the production of the product; and

    an analysis component that, in operation;

    quantifies a subset of the plurality of process-related resource data elements to produce a bill of materials (BOM) per unit comprising a cost associated to the water consumption, a cost associated to the energy consumption, or both as a function of an amount of the product produced by the at least one process of the plurality of defined processes, wherein the subset of the plurality of process-related resource data elements is quantified with respect to the descriptive data;

    adjust the BOM per unit to reduce the cost associated to the water consumption or a cost associated to the energy consumption, or both; and

    automatically adjusts the rate of production or the duration of production for the at least one manufacturing process by automatically adjusting at least one load associated with the process based at least on the adjusted BOM per unit, wherein the at least one load comprises a water consumption load, an energy consumption load, or both.

View all claims