Discrete resource management
First Claim
1. A system that facilitates discrete resource management, comprising:
- at least one processor coupled to memory retaining instructions carried out by the at least one processor, in operation, for;
a collection component that, in operation, obtains a plurality of process-related resource data elements from a plurality of autonomous sensor components disposed at a plurality of locations within an industrial environment, wherein each process-related resource data element comprises a value quantifying a water consumption, an energy consumption, or both of one of a plurality of defined processes of the industrial environment, wherein each of the plurality of defined processes is configured to contribute to production of a product;
a marking component that, in operation, associates each of the plurality of process-related resource data elements with descriptive data, wherein the descriptive data comprises environmental conditions, a rate of production, a duration of production, or any combination thereof for at least one manufacturing process of the plurality of defined processes configured to contribute to the production of the product; and
an analysis component that, in operation;
quantifies a subset of the plurality of process-related resource data elements to produce a bill of materials (BOM) per unit comprising a cost associated to the water consumption, a cost associated to the energy consumption, or both as a function of an amount of the product produced by the at least one process of the plurality of defined processes, wherein the subset of the plurality of process-related resource data elements is quantified with respect to the descriptive data;
adjust the BOM per unit to reduce the cost associated to the water consumption or a cost associated to the energy consumption, or both; and
automatically adjusts the rate of production or the duration of production for the at least one manufacturing process by automatically adjusting at least one load associated with the process based at least on the adjusted BOM per unit, wherein the at least one load comprises a water consumption load, an energy consumption load, or both.
1 Assignment
0 Petitions
Accused Products
Abstract
Discrete resource tracking systems (and corresponding methodologies) that collect, tag and store resource consumption and usage values associated with industrial environment processes are provided. The specification can track water, air, gas, electricity, or steam consumption and usage view of a discrete (or batch) processes. Emissions and/or effluents associated with processes and sub-processes can also be collected, tagged and stored as desired. These stored resource consumption and usage and/or emissions and/or effluents data elements can be used for a variety of purposes including, but not limited to, simulation, planning, forecasting, valuating, optimizing, etc.
146 Citations
19 Claims
-
1. A system that facilitates discrete resource management, comprising:
at least one processor coupled to memory retaining instructions carried out by the at least one processor, in operation, for; a collection component that, in operation, obtains a plurality of process-related resource data elements from a plurality of autonomous sensor components disposed at a plurality of locations within an industrial environment, wherein each process-related resource data element comprises a value quantifying a water consumption, an energy consumption, or both of one of a plurality of defined processes of the industrial environment, wherein each of the plurality of defined processes is configured to contribute to production of a product; a marking component that, in operation, associates each of the plurality of process-related resource data elements with descriptive data, wherein the descriptive data comprises environmental conditions, a rate of production, a duration of production, or any combination thereof for at least one manufacturing process of the plurality of defined processes configured to contribute to the production of the product; and an analysis component that, in operation; quantifies a subset of the plurality of process-related resource data elements to produce a bill of materials (BOM) per unit comprising a cost associated to the water consumption, a cost associated to the energy consumption, or both as a function of an amount of the product produced by the at least one process of the plurality of defined processes, wherein the subset of the plurality of process-related resource data elements is quantified with respect to the descriptive data; adjust the BOM per unit to reduce the cost associated to the water consumption or a cost associated to the energy consumption, or both; and automatically adjusts the rate of production or the duration of production for the at least one manufacturing process by automatically adjusting at least one load associated with the process based at least on the adjusted BOM per unit, wherein the at least one load comprises a water consumption load, an energy consumption load, or both. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8)
-
9. A non-transitory, computer-readable medium comprising executable code comprising instructions to:
-
receive a plurality of process-related resource data elements from a plurality of autonomous sensor components disposed at a plurality of locations within an industrial environment, wherein each process-related resource data element of the plurality of process-related resource data elements comprises a value quantifying an energy consumption, water consumption, or any combination thereof, of a manufacturing process of a plurality of discrete processes of the industrial environment, wherein each of the plurality of discrete processes is configured to contribute to production of a product; receive a plurality of process-related contextual data elements comprising descriptive data comprising environmental conditions, a time of production, an utility rate, or any combination thereof for the manufacturing process; associate each of the plurality of process-related resource data elements with the plurality of process-related contextual data elements; quantify the plurality of process-related resource data elements to produce a bill of material (BOM) per unit, wherein the BOM per unit comprises a cost associated to energy consumption, water consumption or both as a function of a rate of production, a duration of production, or both of the manufacturing process, and wherein the plurality of process-related resource data elements is quantified with respect to the descriptive data; adjust the BOM per unit to reduce the cost associated to the water consumption, a cost associated to the energy consumption, or both; and automatically adjust the rate of production, the duration of production of both of the manufacturing process by automatically adjusting at least one load associated with the process based on the adjusted BOM per unit, wherein the at least one load comprises a water consumption load, an energy consumption load, or both. - View Dependent Claims (10, 11, 12, 13)
-
-
14. A method, comprising:
-
obtaining resource data comprising one or more values quantifying emissions, effluents, or any combination thereof, of at least one manufacturing process of a plurality of processes within an industrial environment from a plurality of autonomous sensor components disposed at a plurality of locations within the industrial environment, wherein each of the plurality of processes is configured to contribute to production of a product; obtaining contextual data describing a time of production, an environmental condition, or any combination thereof for at least one of the plurality of processes; associating a subset of the resource data with a subset of the contextual data based on one or more relationships between the subset of the resource data and the subset of the contextual data; quantifying the subset of the resource data to produce a bill of materials (BOM) per unit as a function of a rate of production, a duration of production, or both for the at least one manufacturing process, wherein the subset of the resource data is quantified with respect to the subset of the contextual data and at least one regulatory requirement, and wherein the BOM per unit comprises a regulatory cost per unit; adjust the BOM per unit to reduce the regulatory cost per unit; and automatically adjusting the rate of production, the duration of production, or both for the at least one manufacturing process by automatically adjusting at least one load associated with the process based on the adjusted BOM per unit, wherein the at least one load comprises a water consumption load, an energy consumption load, or both. - View Dependent Claims (15, 16, 17, 18, 19)
-
Specification