Adjustment of industrial installation
First Claim
1. A method for adjusting an industrial installation, the method comprising:
- analyzing a production plan for the industrial installation, the production plan specifying quantities of resources required by the industrial installation to be available at particular machines or locations at particular dates or times for consumption during production according to a current production sequence schedule;
analyzing incoming events, including one or more production-logistics related events and one or more energy related events, to identify a present critical situation or predict a future critical situation based on an extended event ontology describing critical situations associated with unexpected deviations from the analyzed production plan according to defined temporal dependency relationships between events using rule-based event patterns matching specific combinations of events;
optimizing at least one of power consumption or costs of the power consumption of the industrial installation by initiating, in response to the identified present critical situation or the predicted future critical situation, compensation measures for the industrial installation, the compensation measures being based on compensation rules, which are determined based on sets of compensation strategies for the industrial installation; and
dynamically controlling machinery at the industrial installation by applying the compensation measures such that a delay-minimizing and energy-optimal production sequence schedule is maintained while limiting a number of changes to the current production sequence schedule according to a rescheduling algorithm comprising an edit distance function and a rescheduling threshold value.
1 Assignment
0 Petitions
Accused Products
Abstract
It is proposed that an industrial installation, be operated with the power consumption being optimized for a target function. The target function may also factor in further parameters, with the result that multitarget optimization, for example, can be performed and the installation can be adapted in respect of the power consumption or the power consumption can be adapted in respect of the installation. Both the industrial installation and an energy supplier or network operator provide information which can be factored in as appropriate for the purpose of optimization or as part of the target function. It is advantageous that overload situations are avoided and a large number of regenerative energy sources can be used as energy suppliers, because adaptation is effected in line with the amount of energy actually provided. Hence the power supply system can be operated and loaded as appropriate.
53 Citations
22 Claims
-
1. A method for adjusting an industrial installation, the method comprising:
-
analyzing a production plan for the industrial installation, the production plan specifying quantities of resources required by the industrial installation to be available at particular machines or locations at particular dates or times for consumption during production according to a current production sequence schedule; analyzing incoming events, including one or more production-logistics related events and one or more energy related events, to identify a present critical situation or predict a future critical situation based on an extended event ontology describing critical situations associated with unexpected deviations from the analyzed production plan according to defined temporal dependency relationships between events using rule-based event patterns matching specific combinations of events; optimizing at least one of power consumption or costs of the power consumption of the industrial installation by initiating, in response to the identified present critical situation or the predicted future critical situation, compensation measures for the industrial installation, the compensation measures being based on compensation rules, which are determined based on sets of compensation strategies for the industrial installation; and dynamically controlling machinery at the industrial installation by applying the compensation measures such that a delay-minimizing and energy-optimal production sequence schedule is maintained while limiting a number of changes to the current production sequence schedule according to a rescheduling algorithm comprising an edit distance function and a rescheduling threshold value. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16)
-
-
17. A device for adjusting an industrial installation, the device comprising:
-
at least one memory that stores computer-readable instructions; and at least one processor that executes the computer-readable instructions to implement a registration component, a situation recognition component, a compensation handling component, and a production sequence scheduler component, wherein the registration component analyzes a production plan for the industrial installation, the production plan specifying quantities of resources required by the industrial installation to be available at particular machines or locations at particular dates or times for consumption during production according to a current production sequence schedule, the situation recognition component analyzes incoming events, including one or more production-logistics related events and one or more energy related events, to identify a present critical situation or predict a future critical situation based on an extended event ontology describing critical situations associated with unexpected deviations from the analyzed production plan according to defined temporal dependency relationships between events using rule-based event patterns matching specific combinations of events, the compensation handling component optimizes at least one of power consumption or costs of the power consumption of the industrial installation by initiating, in response to the identified present critical situation or the predicted future critical situation, compensation measures for the industrial installation, the compensation measures being based on compensation rules, which are determined based on sets of compensation strategies for the industrial installation, and the production sequence scheduler component dynamically controls machinery at the industrial installation by applying the compensation measures such that a delay-minimizing and energy-optimal production sequence schedule is maintained while limiting a number of changes to the current production sequence schedule according to a rescheduling algorithm comprising an edit distance function and a rescheduling threshold value. - View Dependent Claims (18, 19, 20, 21, 22)
-
Specification