Mobile network node routing
First Claim
Patent Images
1. A resource manager computer for a telecommunication system, the resource manager computer comprising:
- a memory; and
a processor programmed to execute instructions stored in the memory, wherein, as a result of executing the instructions, the processor;
determines a future location of a first mobile node, wherein the future location of the first mobile node is a location of the first mobile node at a future time,determines a future location of a second mobile node, wherein the future location of the second mobile node is a location where the second mobile node will be in communication with the first mobile node at the future time,associates the future location of the first mobile node and the future location of the second mobile node to the future time,determines a routing path that includes communication between the first mobile node and the second mobile node at the future time,updates a routing table with the routing path, andtransmits the routing table for upload to the first mobile node and the second mobile node.
4 Assignments
0 Petitions
Accused Products
Abstract
A telecommunication system includes a resource manager programmed to determine a future location of a first mobile node and a future location of a second mobile node. The resource manager updates a routing table with the future location of the first mobile node and the future location of the second mobile node and transmits the routing table for upload to the first mobile node and the second mobile node.
-
Citations
18 Claims
-
1. A resource manager computer for a telecommunication system, the resource manager computer comprising:
-
a memory; and a processor programmed to execute instructions stored in the memory, wherein, as a result of executing the instructions, the processor; determines a future location of a first mobile node, wherein the future location of the first mobile node is a location of the first mobile node at a future time, determines a future location of a second mobile node, wherein the future location of the second mobile node is a location where the second mobile node will be in communication with the first mobile node at the future time, associates the future location of the first mobile node and the future location of the second mobile node to the future time, determines a routing path that includes communication between the first mobile node and the second mobile node at the future time, updates a routing table with the routing path, and transmits the routing table for upload to the first mobile node and the second mobile node. - View Dependent Claims (2, 3, 4, 5, 6)
-
-
7. A method comprising:
-
determining, via a resource manager of a telecommunication system, a future location of a first mobile node, wherein the future location of the first mobile node is a location of the first mobile node at a future time; determining a future location of a second mobile node, wherein the future location of the second mobile node is a location where the second mobile node will be in communication with the first mobile node at the future time; associating the future location of the first mobile node and the future location of the second mobile node to the future time; determining a routing path that includes communication between the first mobile node and the second mobile node at the future time; updating a routing table with the routing path; and transmitting the routing table for upload to the first mobile node and the second mobile node. - View Dependent Claims (8, 9, 10, 11, 12)
-
-
13. A telecommunication system comprising:
-
a first satellite following a first orbit; a second satellite following a second orbit different from the first orbit; a system gateway in periodic communication with the first satellite and the second satellite; and a resource manager programmed to determine a future location of a first satellite, determine a future location of a second satellite, wherein the future location of the first satellite is a location of the first satellite at a future time and wherein the future location of the second satellite is a location where the second satellite will be in communication with the first satellite at the future time, wherein the resource manager is further programmed to associate the future location of the first satellite and the future location of the second satellite to the future time, determine a routing path that includes communication between the first satellite and the second satellite at the future time, update a routing table with the routing path, and transmit the routing table to the system gateway, wherein the system gateway is programmed to upload the routing table to the first satellite and to the second satellite, and wherein the first satellite and second satellite are programmed to communicate in accordance with the routing path at the future time. - View Dependent Claims (14, 15, 16, 17, 18)
-
Specification