×

End-user based backup management

  • US 10,284,003 B2
  • Filed: 10/09/2012
  • Issued: 05/07/2019
  • Est. Priority Date: 10/09/2012
  • Status: Active Grant
First Claim
Patent Images

1. A system comprising:

  • a smart meter connected to a utility service, a plurality of backup devices, and a consumer facility, wherein the smart meter is connected;

    between the utility service and the consumer facility; and

    between the plurality of backup devices and the consumer facility;

    wherein the utility service provides a main source of power to the consumer facility and the plurality of backup devices provide a backup source of power to the consumer facility independent of the utility service;

    wherein the smart meter includes a backup management system configured for communicating with the consumer facility;

    wherein the backup management system is configured to;

    receive a plurality of consumer preferences related to charging the plurality of backup devices;

    receive a notification of a predicted power disturbance indicating that the utility service is predicted to be unable to provide the main source of power to the consumer facility, the notification including a time before the predicted power disturbance and a disturbance time period;

    determine a desired charge based on the plurality of consumer preferences and the disturbance time period;

    determine an available charge based on a charge status of each of the plurality of backup devices; and

    determine, if the desired charge is greater than the available charge, a time to charge the plurality of backup devices such that the available charge reaches the desired charge; and

    create, if the time before the predicted power disturbance is greater than the time to charge the plurality of backup devices, a charging schedule for charging the plurality of backup devices, wherein the charging schedule is based on energy costs over the time before the predicted power disturbance, the time before the predicted power disturbance, and the charge status of each backup device.

View all claims
  • 2 Assignments
Timeline View
Assignment View
    ×
    ×