×

Time interval assessment of mission plan quality dynamic asset allocation

  • US 10,296,862 B1
  • Filed: 05/12/2016
  • Issued: 05/21/2019
  • Est. Priority Date: 05/12/2016
  • Status: Active Grant
First Claim
Patent Images

1. A system, comprising:

  • a memory to store computer-executable components; and

    a processor to execute instructions corresponding to the computer-executable components from the memory, the computer-executable components comprising;

    at least one mission planner that processes one or more mission plan inputs and generates a mission definition file (MDF) that includes mission data that describes one or more mission plans for one or more manned or unmanned vehicles;

    a task achievement evaluator that evaluates task criteria to generate individual task quality scores for each of the mission plan input tasks processed by the at least one mission planner, the task quality scores representing an expectation of how the planned task is to be executed;

    a mission plan constructor to process the MDF from the at least one mission planner and the task quality scores from the task achievement evaluator to generate a plan score for one or more annotated mission plans; and

    a plan comparator to process the one or more annotated mission plans, the plan comparator generating graphical output data from the output quality scores generated by the task achievement evaluator, the graphical output data configured as a mission plan evaluation chart, the mission plan evaluation chart providing the plan score generated by the mission plan constructor, the plan comparator comprising;

    a spatial temporal forecaster to project planned mission states to a specified future point in time; and

    a human machine interface (HMI) for visualizing mission plans and projected future states of the mission plans, the HMI comprising a graphical user interface (GUI) to display the mission plan evaluation chart generated by the plan comparator, the GUI providing a visualization of the tasks and constraints that drive the mission plan inputs, a visualization of the task achievement quality scores associated with data-collection resources associated with the one or more vehicles, a visualization of a primary mission plan among the one or more mission plans, and a visualization of the plan score,wherein the plan comparator generates a behavior and a duration display output to the GUI to indicate when a loaded mission plan is active and the amount of time that the loaded mission plan is active and when data can be collected by the resources.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×