×

System and method for optimizing daylight harvesting in distributed sites

  • US 10,314,139 B2
  • Filed: 03/23/2016
  • Issued: 06/04/2019
  • Est. Priority Date: 03/11/2016
  • Status: Active Grant
First Claim
Patent Images

1. A method for optimizing operation of one or more skylights of one or more distributed sites to facilitate daylight harvesting, the method comprising:

  • identifying, by a lighting control system, one or more skylight-linked lighting circuits from a plurality of lighting circuits by analyzing at least one of site configuration data, site instrumentation data, or ambient data;

    determining, by the lighting control system, interception points configured for each identified skylight-linked lighting circuit to switch from daylight utilization to electric consumption and to switch from electric consumption to daylight utilization, wherein the interception points are determined based on at least one of the site configuration data, the site instrumentation data or the ambient data;

    deriving, by the lighting control system, a second operation schedule for the operation of one or more skylight linked lighting circuits based on the interception points and current operation schedule of the skylight linked lighting circuits;

    detecting, by the lighting control system, deviations in the operation of the one or more skylights based on the derived second operation schedule;

    identifying, by the lighting control system, one or more causes of the deviations by correlating the ambient data with the site instrumentation data and the site configuration data;

    deriving, by the lighting control system, a corrective action for each deviation based on analysis of at least one of the one or more causes, the site configuration data, operational limitations of the skylight linked lighting circuits, historical data related to the operation of the one or more skylights, comparison with peer sites, or corrective action database;

    prioritizing, by the lighting control system, the corrective actions corresponding to the deviations based on a quantum of deviation or cost associated with the corrective action; and

    implementing, by the lighting control system, the corrective action corresponding to the deviations based on the prioritization to optimize the operation of the one or more skylights.

View all claims
  • 3 Assignments
Timeline View
Assignment View
    ×
    ×