Method of and system for drilling information management and resource planning
First Claim
1. A method for executing a directional-drilling project, the method comprising:
- storing, on a database, drilling-project data;
transferring, to a computer, the drilling-project data;
uploading, to the computer, equipment information;
determining, via the computer, calibration data, the calibration data comprising a difference between a magnetic azimuth and a grid azimuth;
transferring, from the computer to a wireless data transmission assembly, the calibration data;
executing, via the wireless data transmission assembly, the directional-drilling project;
recording, via the computer, parameters related to the directional-drilling project, the parameters comprising at least one of consumables used, equipment service time, activities during a shift, a notification of equipment problems, and a notification of drilling problems;
utilizing the parameters to determine at least one of diagnostic information, borehole design assistance, drilling problem assistance, and equipment problem assistance; and
transmitting, via an antenna, drilling data from the wireless data transmission assembly to the computer.
1 Assignment
0 Petitions
Accused Products
Abstract
In one aspect, the present disclosure relates to a drilling-information-management system. The drilling-information management system includes a probe assembly disposed on a drill rod, a first computer interoperably coupled to the probe assembly via a conductor disposed in a drill rod, and a second computer in communication with the first computer. The second computer includes a barcode scanner. The drilling-information management system includes a database in communication with the second computer. Drilling-project data is transferred from the database to the second computer and calibration data is transferred from the second computer to the first computer. The first computer executes a drilling plan according to the drilling-project data.
16 Citations
6 Claims
-
1. A method for executing a directional-drilling project, the method comprising:
-
storing, on a database, drilling-project data; transferring, to a computer, the drilling-project data; uploading, to the computer, equipment information; determining, via the computer, calibration data, the calibration data comprising a difference between a magnetic azimuth and a grid azimuth; transferring, from the computer to a wireless data transmission assembly, the calibration data; executing, via the wireless data transmission assembly, the directional-drilling project; recording, via the computer, parameters related to the directional-drilling project, the parameters comprising at least one of consumables used, equipment service time, activities during a shift, a notification of equipment problems, and a notification of drilling problems; utilizing the parameters to determine at least one of diagnostic information, borehole design assistance, drilling problem assistance, and equipment problem assistance; and transmitting, via an antenna, drilling data from the wireless data transmission assembly to the computer. - View Dependent Claims (2, 3, 4, 5, 6)
-
Specification