Automatic network topology detection and fraud detection
First Claim
1. A method comprising:
- receiving, at an electricity meter of a utility network, a trigger to determine a physical power distribution topology of at least a portion of the utility network associated with a given node;
identifying, at the electricity meter, one or more other utility metering nodes potentially connected to the given utility metering node based, at least in part, on location information or communication network information of the given utility metering node and the one or more other utility metering nodes;
correlating, by the electricity meter, value changes indicating a change in amount of utility consumption associated with the given utility metering node and value changes indicating a change in amount of utility consumption associated with the one or more other utility metering nodes with respect to a physical quantity; and
determining, at the electricity meter, the physical power distribution topology of at least the portion of the utility network comprising the given utility metering node and at least one node of the one or more other utility metering nodes based at least in part on the correlating of value changes that indicate the change in amount of utility consumption associated with the given utility metering node and the value changes indicating the change in amount of utility consumption associated with the one or more other utility metering nodes.
3 Assignments
0 Petitions
Accused Products
Abstract
Given a node of a utility service distribution network, a topology of a subset of the distribution network having the given node as a root node and one or more child nodes branching from the given node is determined. The topology may be determined based on relationships or correlations of utility usage information between the given node and a plurality of potential nodes that are considered in the topology determination. Upon determining the topology associated with the given node, the determined topology may be used to detect fraud and leakage that may occur in the distribution network on a regular basis or upon request. If fraud or leakage is detected in the distribution network, the system may schedule a follow-up and/or field investigation to investigate and fix the fraud or the leakage in the distribution network.
92 Citations
20 Claims
-
1. A method comprising:
-
receiving, at an electricity meter of a utility network, a trigger to determine a physical power distribution topology of at least a portion of the utility network associated with a given node; identifying, at the electricity meter, one or more other utility metering nodes potentially connected to the given utility metering node based, at least in part, on location information or communication network information of the given utility metering node and the one or more other utility metering nodes; correlating, by the electricity meter, value changes indicating a change in amount of utility consumption associated with the given utility metering node and value changes indicating a change in amount of utility consumption associated with the one or more other utility metering nodes with respect to a physical quantity; and determining, at the electricity meter, the physical power distribution topology of at least the portion of the utility network comprising the given utility metering node and at least one node of the one or more other utility metering nodes based at least in part on the correlating of value changes that indicate the change in amount of utility consumption associated with the given utility metering node and the value changes indicating the change in amount of utility consumption associated with the one or more other utility metering nodes. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9)
-
-
10. An electricity meter comprising:
a processing unit configured to perform acts comprising; receiving, at the electricity meter, a trigger to determine a physical power distribution topology of at least a portion of the utility network associated with a given utility metering node; identifying, at the electricity meter, one or more other utility metering nodes potentially connected to the given utility metering node based, at least in part, on location information or communication network information of the given utility metering node and the one or more other utility metering nodes; correlating, by the electricity meter, value changes indicating a change in amount of utility consumption associated with the given utility metering node and value changes indicating a change in amount of utility consumption associated with the one or more other utility metering nodes with respect to a physical quantity; and determining, at the electricity meter, the physical power distribution topology of at least the portion of the utility network comprising the given utility metering node and at least one node of the one or more other utility metering nodes based at least in part on the correlating of value changes that indicate the change in amount of utility consumption associated with the given utility metering node and the value changes indicating the change in amount of utility consumption associated with the one or more other utility metering nodes. - View Dependent Claims (11, 12, 13, 14, 15, 16, 17, 18, 19)
-
20. One or more non-transitory computer readable media storing executable instructions that, when executed by a processing unit of an electricity meter, configure the electricity meter to perform acts comprising:
-
receiving, at the electricity meter, a trigger to determine a physical power distribution topology of at least a portion of a utility network associated with a given utility metering node; identifying, at the electricity meter, one or more other utility metering nodes potentially connected to the given utility metering node based, at least in part, on location information or communication network information of the given utility metering node and the one or more other utility metering nodes; correlating, by the electricity meter, value changes indicating a change in amount of utility consumption associated with the given utility metering node and value changes indicating a change in amount of utility consumption associated with the one or more other utility metering nodes with respect to a physical quantity; and determining, at the electricity meter, the physical power distribution topology of at least the portion of the utility network comprising the given utility metering node and at least one node of the one or more other utility metering nodes based at least in part on the correlating of value changes that indicate the change in amount of utility consumption associated with the given utility metering node and the value changes indicating the change in amount of utility consumption associated with the one or more other utility metering nodes.
-
Specification