Method and apparatus for testing and displaying test results
First Claim
Patent Images
1. A test instrument, comprising:
- a project memory for storing information about a project under test including tested status, wherein said project under test comprises testing a plurality of network cables;
a processor for determining a completion amount corresponding to an amount of the project under test that has been completed;
a display comprising a graphical user interface (GUI), wherein the GUI is configured to;
display the completion amount;
display a result of the project under test simultaneously with a first plurality of project management GUI control elements providing links to project management functionality for managing status of a plurality of testing projects including the project under test;
display a testing GUI control element accompanying one or more network cables having a failed status, whereby the testing GUI control element displays a suggested next operational step for a user to select, wherein said suggested next operational step comprises at least one of a fix later or test again functionality; and
responsive to user selection of one of the first plurality of project management GUI control elements, display a second plurality of project management GUI control elements that provide further links to additional project management functionality for managing status of the plurality of testing projects.
0 Assignments
0 Petitions
Accused Products
Abstract
A test instrument provides suggested next operational step function to provide a user with assistance during testing. A display is provided to show the amount of a project that has been completed, for example as a percentage completed value. Individual test results may be saved to a ‘fix later’ list, which may be later accessed to re-test items that may not have passed on initial testing.
40 Citations
20 Claims
-
1. A test instrument, comprising:
-
a project memory for storing information about a project under test including tested status, wherein said project under test comprises testing a plurality of network cables; a processor for determining a completion amount corresponding to an amount of the project under test that has been completed; a display comprising a graphical user interface (GUI), wherein the GUI is configured to; display the completion amount; display a result of the project under test simultaneously with a first plurality of project management GUI control elements providing links to project management functionality for managing status of a plurality of testing projects including the project under test; display a testing GUI control element accompanying one or more network cables having a failed status, whereby the testing GUI control element displays a suggested next operational step for a user to select, wherein said suggested next operational step comprises at least one of a fix later or test again functionality; and responsive to user selection of one of the first plurality of project management GUI control elements, display a second plurality of project management GUI control elements that provide further links to additional project management functionality for managing status of the plurality of testing projects. - View Dependent Claims (2, 3)
-
-
4. A method of operating a test instrument, comprising:
-
providing a project memory for storing information about a project under test including tested status, wherein said project under test comprises testing a plurality of network cables; providing project management functionality for managing status of a plurality of testing projects including the project under test; determining a completion amount corresponding to an amount of the project under test that has been completed; displaying, on a graphical user interface (GUI), the completion amount, displaying, on the GUI, a result of the project under test and simultaneously displaying on the GUI a first plurality of project management GUI control elements providing links to the project management functionality; displaying, on the GUI, a testing GUI control element accompanying one or more network cables having a failed status, whereby the testing GUI control element displays a suggested next operational step for a user to select, wherein said suggested next operational step comprises at least one of a fix later or test again functionality; and displaying, on the GUI, responsive to user selection of one of the first plurality of project management GUI control elements, a second plurality of project management GUI control elements that provide further links to additional project management functionality. - View Dependent Claims (5, 6)
-
-
7. A method of operating a test instrument, comprising:
-
displaying, on a graphical user interface (GUI) of the test instrument, a completion amount indicating an amount of a project under test that has been completed, wherein said project under test comprises testing a plurality of network cables; displaying, on the GUI, a result of the project under test and simultaneously displaying on the GUI a first plurality of project management GUI control elements providing links to project management functionality; displaying, on the GUI, a suggested next operational step for a user to select, wherein displaying a suggested next operational step comprises providing a testing GUI control element selectable to accomplish the next operational step; and responsive to user selection of one of the first plurality of project management GUI control elements, displaying on the GUI a second plurality of project management GUI control elements, wherein the second plurality of project management GUI control elements includes at least one of Rename, Copy, and Delete GUI control elements, wherein selection of the Rename GUI control element prompts the user to enter a new name to be associated with the project under test, selection of the Copy GUI control element causes one or more project settings for the project under test to be copied to a different testing project, and selection of the Delete GUI control element causes deletion of the result of the project under test. - View Dependent Claims (8, 9, 10)
-
-
11. A method of operating a test instrument, comprising:
-
providing, by the test instrument, a test functionality for testing a plurality of network cables, wherein the test functionality is organized into a plurality of testing projects; and providing, by the test instrument, project management functionality for managing the plurality of testing projects; displaying, on a graphical user interface (GUI) of the test instrument, a result of the test functionality for one of the plurality of testing projects performed on the plurality of network cables and simultaneously displaying on the GUI a first plurality of project management GUI control elements providing links to the project management functionality; displaying, on the GUI, a selectable testing GUI control element that accompanies one or more network cables having a failed status, whereby the testing GUI control element displays a next operational step to be performed including an identifier indicating at least one of a fix later or test again functionality; and responsive to user selection of one of the first plurality of project management GUI control elements, displaying on the GUI a second plurality of project management GUI control elements that provide further links to additional project management functionality for managing the plurality of testing projects. - View Dependent Claims (12, 13)
-
-
14. A test instrument, comprising:
-
a test module for providing test stimulus to and receiving and recording measurement results from a cable under test; a display in communication with the test module, wherein the test module causes the display to; display, on a graphical user interface (GUI) of the test instrument, measurement results of the cable under test and simultaneously display on the GUI a first plurality of project management GUI control elements providing links to project management functionality provided by the test module; display, on the GUI, a selectable testing GUI control element in response to a measurement result of the cable under test having a failed status, whereby the testing GUI control element displays a next operational step to be performed including an identifier indicating at least one of a fix later or test again functionality; and responsive to user selection of one of the first plurality of project management GUI control elements, display on the GUI a second plurality of project management GUI control elements that provide further links to additional project management functionality provided by the test module; and a memory for storing a list of measurement results warranting retesting. - View Dependent Claims (15, 16)
-
-
17. A method of operating a test instrument, comprising:
-
providing, on a display of the test instrument, a graphical representation of a network cable under test, wherein the graphical representation includes elements depicting connectors of the cable under test or test events detected by the test instrument while conducting a test of the cable under test; enabling user selection of an individual connector or event on the cable under test by selection of an element in the graphical representation of the cable under test on the display; displaying, on the display, a test result related to a user-selected connector or event and simultaneously displaying on the display a first plurality of project management GUI control elements providing links to project management functionality provided by the test instrument; displaying on the display, a selectable testing GUI control element accompanying a displayed connector or event indicating a failed status, whereby the testing GUI control element displays a suggested next operational step for a user to select, wherein said suggested next operational step comprises at least one of a fix later or test again functionality; and responsive to user selection of one of the first plurality of project management GUI control elements, displaying on the display a second plurality of project management GUI control elements that provide further links to additional project management functionality provided by the test instrument. - View Dependent Claims (18, 19, 20)
-
Specification