×

System and process for jet fuel equipment and procedure quality control

  • US 10,359,408 B2
  • Filed: 12/09/2015
  • Issued: 07/23/2019
  • Est. Priority Date: 12/09/2014
  • Status: Active Grant
First Claim
Patent Images

1. A system for monitoring jet fuel quality control procedural compliance, said system comprising:

  • an equipment module having an equipment database and causing a processor and memory to carry out instructions;

    an equipment database operable to store jet fuel equipment data and jet fuel equipment inspection reports;

    the equipment module storing said inspection reports processes, each inspection report customized to a particular type of j et fuel equipment;

    said inspection reports including inspection steps, one or more tests, and input to document said test, and a test result;

    the system presenting an interactive interface for receiving input, storage, and processing of jet fuel and jet fuel equipment said inspections reports;

    wherein said jet fuel equipment data includes a facility location and a time zone.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×