×

Building system commissioning automation

  • US 10,359,745 B2
  • Filed: 06/17/2016
  • Issued: 07/23/2019
  • Est. Priority Date: 06/17/2016
  • Status: Active Grant
First Claim
Patent Images

1. A controller of a plurality of building system devices having logic to:

  • receive a set of commands specified by a sequence of operations (SOO) script;

    execute the set of commands to run an SOO check on the plurality of building system devices, wherein executing the set of commands to run the SOO check on the plurality of building system devices includes;

    performing a sequence of test procedures for each of the plurality of building system devices, wherein the sequence of test procedures for each of the plurality of building system devices includes activating, deactivating, and adjusting a state of each of the plurality of building system devices; and

    determining results including a plurality of point values associated with each of the plurality of building system devices based on the test procedures; and

    generate a report including results of the SOO check.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×