Void reducing asphalt membrane composition, method and apparatus for asphalt paving applications
First Claim
1. A method of forming a pavement construction joint, comprising:
- dispensing a band of a void reducing joint composition on a substrate using at least one spray application vehicle, wherein the band comprises a width of about 4 to about 24 inches and a sufficient thickness to permit migration upward into a paving pass positioned over the band to reduce an air void volume in such paving pass;
permitting the application of two paving passes to form a pavement construction joint having a volume of air voids, wherein the pavement construction joint is positioned over the band; and
allowing at least a portion of the joint composition to migrate upward into the two paving passes along the pavement construction joint to reduce the volume of air voids.
2 Assignments
0 Petitions
Accused Products
Abstract
A method of forming a pavement construction joint that involves dispensing a band of a void reducing joint composition on a substrate using at least one spray application vehicle, wherein the band comprises a width of about 4 to about 24 inches. A paving pass is applied over the band of joint composition, wherein the paving pass is positioned against an edge of a previously laid portion of pavement to form a pavement construction joint having a volume of air voids. At least a portion of the joint composition migrates upward to reduce the volume of air voids. The composition is resistant to flow when applied and migrates into hot mix asphalt in the area of the longitudinal joint to reduce air voids to 7% or less and reduce water permeability. The composition becomes tack-free quickly after application. The composition bonds to asphalt, concrete, brick, stone and metal.
76 Citations
10 Claims
-
1. A method of forming a pavement construction joint, comprising:
-
dispensing a band of a void reducing joint composition on a substrate using at least one spray application vehicle, wherein the band comprises a width of about 4 to about 24 inches and a sufficient thickness to permit migration upward into a paving pass positioned over the band to reduce an air void volume in such paving pass; permitting the application of two paving passes to form a pavement construction joint having a volume of air voids, wherein the pavement construction joint is positioned over the band; and allowing at least a portion of the joint composition to migrate upward into the two paving passes along the pavement construction joint to reduce the volume of air voids. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10)
-
Specification