×

Method and system for controlling a scheduling order of multimedia content for a broadcast

  • US 10,372,309 B2
  • Filed: 08/27/2015
  • Issued: 08/06/2019
  • Est. Priority Date: 08/16/2010
  • Status: Active Grant
First Claim
Patent Images

1. A method executed by a computing device for populating a multimedia schedule for broadcast, the method comprising:

  • selecting, via a user interface of the computing device, a plurality of multimedia content corresponding to at least one multimedia category;

    performing a first portion of an automated scheduling task by scheduling a first daypart and an adjacent second daypart of a plurality of dayparts of a first day with the plurality of multimedia content using a forward scheduling algorithm, wherein the first daypart and the second daypart have respective first and second transition periods adjacent to one another;

    performing a second portion of the automated scheduling task by scheduling a third daypart and an adjacent fourth daypart of a second plurality of dayparts of a second day being adjacent the first day with the plurality of multimedia content using the forward scheduling algorithm, wherein the third daypart and the fourth daypart have respective third and fourth transition periods adjacent to one another;

    performing a third portion of the automated scheduling task by scheduling the first, second, third and fourth transition periods using a reverse scheduling algorithm, the reverse scheduling algorithm satisfying both horizontal and vertical adjacency requirements, wherein the horizontal adjacency requirements include a requirement that a multimedia content of the plurality of multimedia content is not also scheduled in adjacent transition periods of adjacent dayparts, and the vertical adjacency requirements include a requirement that the multimedia content of the plurality of multimedia content is not also scheduled during an equivalent transition period of the second day; and

    broadcasting the plurality of multimedia content in accordance with the first, second, and third portions of the automated scheduling task.

View all claims
  • 8 Assignments
Timeline View
Assignment View
    ×
    ×