Single phase power factor correction system and method

  • US 10,396,594 B2
  • Filed: 10/20/2009
  • Issued: 08/27/2019
  • Est. Priority Date: 10/20/2008
  • Status: Active Grant
First Claim
Patent Images

1. A single phase grid correction system for correcting the power factor of an electrical power grid, said grid having an electricity supply, at least one transmission line connecting said supply to a plurality of distribution nodes, a number of feeder lines radiating from each node, a plurality of consumers connected to each feeder line, each consumer having individual premises with a single phase consumer electrical panel therein for receiving power from said feeder line and each consumer having an electrical meter associated with the premises, said system comprising:

  • a plurality of capacitor banks corresponding to said plurality of consumers, each of said capacitor banks being connected to said panel of one of said plurality of consumers, each of said capacitor banks being located at said individual premises and downstream from said electrical meter, wherein said electrical meter is configured to measure electrical power consumption by the corresponding consumer;

    a plurality of remotely controlled capacitor bank switches, each remotely controlled capacitor bank switch being connected to one of said capacitor banks for connecting or disconnecting said capacitor bank from said corresponding feeder line for reactive power compensation, said remotely controlled capacitor bank switch including a receiver for receiving instructions for connecting said capacitor bank to said corresponding feeder line or disconnecting said capacitor bank from said corresponding feeder line, and for operating said switch according to said instructions, said capacitor bank and remotely controlled capacitor bank switch being housed indoors of said individual premises proximate to or within said electrical panel; and

    a utility operator controller in communication with said receivers, said utility operator controller adapted to determine whether a power factor correction is required to said electrical power grid upstream from said distribution nodes and if said power factor correction is required, said utility operator controller being configured to transmit said instructions to said receiver of at least two of said remotely controlled capacitor bank switches corresponding to at least two of said distribution nodes for reactive power compensation corresponding to said power factor correction;

    wherein said utility operator controller includes a computer programmed to compare circumstances existing at the time when said switches are to be operated with circumstances at prior times and for locating similar circumstances which existed at one or more prior times, and for determining a previous power factor correction which was provided at such prior time or times and for then using such information to determine the number and distribution of capacitor banks which if connected to said grid would supply reactive power sufficient to correct the power factor of said grid to a selected value, and for then sending instructions to switch on the required number of capacitor banks at the locations as determined by said computer.