System and method for dumping material
First Claim
Patent Images
1. A method for depositing a pile of material along a path by a machine at a worksite, the method comprising:
- (a) storing a threshold volume of material to be moved along the path by a ground engaging work implement of the machine;
(b) storing a threshold pile length measured along the path;
(c) determining, by a controller, a transported volume of material transported by the ground engaging work implement of the machine along the path;
(d) determining, by the controller, a pile depositing factor based upon a difference between the threshold volume of material and the transported volume of material, the pile depositing factor being a ratio between the threshold volume of material and the transported volume of material;
(e) determining, by the controller, at least one parameter associated with the pile as a function of the threshold pile length and the pile depositing factor, the at least one parameter being a pile length along the path of the pile to be formed; and
(f) operating, by the controller, the machine to deposit the determined volume to form the pile, on a working surface of the worksite, based on the at least one parameter.
1 Assignment
0 Petitions
Accused Products
Abstract
A method for depositing a pile of material by a machine at a worksite. The method includes determining, by a controller, a volume of material transported by the machine. The method further includes determining, by the controller, at least one parameter associated with the pile to be formed by the determined volume based on a comparison of the determined volume with a threshold volume and operating the machine to deposit the determined volume to form the pile, on a working surface of the worksite, based on the at least one parameter.
-
Citations
20 Claims
-
1. A method for depositing a pile of material along a path by a machine at a worksite, the method comprising:
-
(a) storing a threshold volume of material to be moved along the path by a ground engaging work implement of the machine; (b) storing a threshold pile length measured along the path; (c) determining, by a controller, a transported volume of material transported by the ground engaging work implement of the machine along the path; (d) determining, by the controller, a pile depositing factor based upon a difference between the threshold volume of material and the transported volume of material, the pile depositing factor being a ratio between the threshold volume of material and the transported volume of material; (e) determining, by the controller, at least one parameter associated with the pile as a function of the threshold pile length and the pile depositing factor, the at least one parameter being a pile length along the path of the pile to be formed; and (f) operating, by the controller, the machine to deposit the determined volume to form the pile, on a working surface of the worksite, based on the at least one parameter. - View Dependent Claims (2, 3, 4, 5, 6, 7)
-
-
8. A material depositing system for a machine operating at a worksite, the material depositing system comprising:
-
a ground engaging work implement of the machine configured for moving material along a path at the worksite; a controller operatively coupled to the machine, the controller configured to; (a) store a threshold volume of material to be moved by the work implement; (b) store a threshold pile length measured along the path; (c) determine a transported volume of material transported by the ground engaging work implement of the machine along the path; (d) determine a pile depositing factor based upon a difference between the threshold volume of material and the transported volume of material, the pile depositing factor being a ratio between the threshold volume of material and the transported volume of material; (e) determine at least one parameter associated with a pile to be formed as a function of the threshold pile length and the pile depositing factor, the at least one parameter being a pile length along the path of the pile to be formed; and (f) operate the machine to form the pile, on a working surface of the worksite, based on the at least one parameter. - View Dependent Claims (9, 10, 11, 12, 13, 14)
-
-
15. A machine configured to operate at a worksite, the machine comprising:
-
a ground engaging work implement of the machine configured for moving material along a path at the worksite; at least one machine sensor configured to generate at least one machine signal; a controller communicably coupled to the at least one machine sensor, the controller configured to; (a) store a threshold volume of material to be moved by the work implement; (b) store a threshold pile length measured along the path; (c) receive the at least one machine signal from the at least one machine sensor; (d) determine a transported volume of material transported by the ground engaging work implement of the machine along the path based on the at least one machine signal; (e) determine a pile depositing factor based upon a difference between the threshold volume of material and the transported volume of material, the pile depositing factor being a ratio between the threshold volume of material and the transported volume of material; (f) determine at least one parameter associated with a pile to be formed as a function of the threshold pile length and the pile depositing factor, the at least one parameter being a pile length along the path of the pile to be formed; and (g) generate a machine operation signal to cause the machine to deposit the determined volume to form the pile on a working surface of the worksite based on the at least one parameter. - View Dependent Claims (16, 17, 18, 19, 20)
-
Specification