Systems and methods for analyzing resource production
First Claim
Patent Images
1. A method for completing a well within a field, the method comprising:
- receiving completion parameters associated with one or more additional wells within the field, a first portion of the completion parameters being received in a form of structured data, and a second portion of the completion parameters being received in a form of unstructured data;
transforming the unstructured data into transformed structured data;
based on the received completion parameters in the form of the structured data and the transformed structured data, building a plurality of field-specific models;
selecting one of the plurality of field-specific models, wherein the selected field-specific model incorporates a proximity depletion synthetic variable derived from distances to adjacent wells from the well within the field and times of production of the adjacent wells;
receiving a production objective associated with the well within the field;
based on the selected field-specific model, prescribing proposed completion parameters for the well to comply with the production objective using a completion engine;
based on the proposed completion parameters and the selected field-specific model, projecting a proposed production for the well using the completion engine; and
recompleting or reworking the well in accordance with the proposed completion parameters.
1 Assignment
0 Petitions
Accused Products
Abstract
A method for completing a well includes receiving completion parameters associated with a well within a field; projecting a production of the well based on the completion parameters using a completion engine applied to a field-specific model; prescribing proposed completion parameters for the well to comply with a production objective using the completion engine applied to the field-specific model; projecting a proposed production based on the proposed completion parameters using the completion engine applied to the field-specific model; and recompleting the well in accordance with the proposed completion parameters.
64 Citations
19 Claims
-
1. A method for completing a well within a field, the method comprising:
-
receiving completion parameters associated with one or more additional wells within the field, a first portion of the completion parameters being received in a form of structured data, and a second portion of the completion parameters being received in a form of unstructured data; transforming the unstructured data into transformed structured data; based on the received completion parameters in the form of the structured data and the transformed structured data, building a plurality of field-specific models; selecting one of the plurality of field-specific models, wherein the selected field-specific model incorporates a proximity depletion synthetic variable derived from distances to adjacent wells from the well within the field and times of production of the adjacent wells; receiving a production objective associated with the well within the field; based on the selected field-specific model, prescribing proposed completion parameters for the well to comply with the production objective using a completion engine; based on the proposed completion parameters and the selected field-specific model, projecting a proposed production for the well using the completion engine; and recompleting or reworking the well in accordance with the proposed completion parameters. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19)
-
Specification