×

Maintenance optimization for asset performance management

  • US 10,416,662 B2
  • Filed: 09/22/2015
  • Issued: 09/17/2019
  • Est. Priority Date: 09/22/2015
  • Status: Active Grant
First Claim
Patent Images

1. A system, comprising:

  • a processor capable of performing a method comprising;

    receiving one or more predictive maintenance models each defining a time-based probability of failure for one or more components;

    receiving current performance data for the components;

    defining a failure function for each component from a predictive maintenance model for the component and the current performance data for the component, the failure function defining the probability of failure of the component in each of a set of time periods;

    defining a value loss function for each component from the failure function for the component and a time-based component cost, the value loss function defining the expected value loss due to a planned replacement of the component in a given time period before the component fails or reaches its scheduled end-of-life;

    receiving data defining one or more factors that have an impact on the cost of a maintenance option;

    defining one or more time buckets, wherein the one or more time buckets define a time period in which maintenance takes place for the one or more components, wherein maintenance activities are optimized in response to the maintenance for one or more components being planned in a same time bucket associated with the one or more time buckets;

    for each of the one or more time buckets, determining a machine downtime due to an unexpected failure of the one or more components, and determining an expected impact on production and on maintenance resources due to the machine downtime;

    creating and presenting a plurality of interactive optimization models for each component from the component failure functions, the value loss functions and the data defining one or more factors that have an impact on the cost of a maintenance option, wherein the created and presented plurality of interactive optimization models comprise adjustable and selectable maintenance options for each component;

    adjusting and updating at least one of the created and presented plurality of interactive optimization models based on a user adding one or more different constraints on the at least one of the created and presented plurality of interactive optimization models, wherein the one or more different constraints are based on an availability of resources and maintenance goals.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×