×

Point-based risk score for managing environmental systems

  • US 10,417,596 B2
  • Filed: 11/01/2016
  • Issued: 09/17/2019
  • Est. Priority Date: 05/05/2014
  • Status: Active Grant
First Claim
Patent Images

1. A computer-implemented method of using an environmental maintenance system that includes a plurality of actuators and a plurality of sensors in an environmentally-controlled space, each sensor measuring a value of a physical condition at a respective location, the method comprising:

  • obtaining, by a computer system, an influence model for an actuator of an environmental maintenance module, wherein the influence model provides a change in a sensor value at a respective location for a corresponding change in an operation level of the actuator, wherein the operation level quantifies a functioning property of the actuator;

    for each of one or more of the locations;

    for each of one or more times;

    detecting, by the computer system, a current operation level for each of the actuators;

    identifying, by the computer system, an operation threshold value for each of the actuators; and

    calculating, by the computer system, a reserve value at the location using a reserve metric that includes the influence model, the current operation levels, and the operation threshold values, wherein an operation threshold value is a maximum achievable value for the functioning property of the actuator, wherein the reserve value indicates a maximum achievable change in the sensor value at the location, wherein the reserve metric is time-dependent; and

    managing the environmental maintenance system or loads in the environmentally-controlled space based on the one or more reserve values, wherein the managing includes;

    allocating a computational load to one or more server computers in the environmentally-controlled space based on the one or more reserve values by sending a first command to a first server computer to assign a first computational load to the first server computer based on the one or more reserve values.

View all claims
  • 2 Assignments
Timeline View
Assignment View
    ×
    ×