×

Synchronization of parallel gensets with source arbitration

  • US 10,418,817 B2
  • Filed: 07/29/2016
  • Issued: 09/17/2019
  • Est. Priority Date: 07/29/2016
  • Status: Active Grant
First Claim
Patent Images

1. A method of synchronization, comprising:

  • receiving, at a first generator set, data indicating a characteristic for a component of a voltage for a source;

    receiving, at a second generator set, the data indicating the characteristic for the component of the voltage for the source;

    calculating, by each of the first and second generator sets, a speed offset parameter and a voltage offset parameter based on the received data, the first and second generator sets configured to receive the same data indicating the component of the voltage for the source and independently calculate the speed offset parameter and the voltage offset parameter based on the same data indicating the component of the voltage for the source; and

    controlling operation of the first and second generator sets based on the calculated speed offset and voltage offset parameters,wherein the calculating the speed offset parameter comprisesgenerating the speed offset parameter based on a frequency and a phase of the voltage for the source and a frequency and a phase of an output voltage of the first generator set for the first generator set using a speed proportional integral loop of the first generator set,wherein the calculating the voltage offset parameter comprisesgenerating the voltage offset parameter based on a magnitude of the voltage for the source and a magnitude of the output voltage of the first generator set using a magnitude proportional integral loop of the first generator set, andwherein the controlling the operation of the first generator set comprisescontrolling the magnitude of the output voltage of the first generator set based on the voltage offset parameter, the magnitude of the output voltage of the first generator set, and a reference magnitude using a voltage regulator proportional-integral-derivative controller of the first generator set.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×