Infrastructure resource management system
First Claim
1. A computing system for supporting infrastructure resource management in a datacenter, the computing system comprising:
- a processor and a memory containing instructions executable by the processor to cause the computing system to;
receive infrastructure device data for an infrastructure device configured to consume a physical resource of an infrastructure in the datacenter;
generate, based on the received infrastructure device data, an operation instance having a plurality of attributes corresponding to the infrastructure device, the operation instance comprising requested units that indicate an amount of a physical resource needed in anticipation of an infrastructure device operation to be performed by the infrastructure device;
communicate operation instructions to one or more additional infrastructure devices for an amount of units of the physical resource to be generated and an amount of units of the physical resource to be reserved based on the generated operation instance and a threshold reserve of the physical resource to ensure proper operation of the infrastructure;
determine an amount of allocated units of the physical resource to the infrastructure device for the infrastructure device operation based in part on the generated operation instance and an amount of units of the physical resource that is being generated and the amount of units of the physical resource that is reserved by the one or more additional infrastructure devices; and
communicate operation instructions to the infrastructure device to begin the infrastructure device operation, thereby consuming the amount of allocated units of the physical resource with the infrastructure device.
1 Assignment
0 Petitions
Accused Products
Abstract
Various methods and systems for implementing resource management for an infrastructure are provided. Resource management includes datacenter byproduct management interfaces, datacenter power management, datacenter operations optimization and infrastructure resource management. Resource management facilitates using and distributing physical resources, including incidental physical resources that are generated during operation of an infrastructure, based on a minimum threshold reserve of the physical resource associated with the operating the infrastructure. Resource management can include controlling an amount of the physical resource that is generated and an amount the physical resource that is reserved. The minimum threshold reserve in combination with the control over generating and reserving the physical resource help identify an allocable amount of the physical resource. Physical resources of an infrastructure are quantified to support resource management. Quantifying physical resources is associated with devices of the infrastructure and requests for physical resources in the infrastructure to perform different types of operations.
48 Citations
19 Claims
-
1. A computing system for supporting infrastructure resource management in a datacenter, the computing system comprising:
a processor and a memory containing instructions executable by the processor to cause the computing system to; receive infrastructure device data for an infrastructure device configured to consume a physical resource of an infrastructure in the datacenter; generate, based on the received infrastructure device data, an operation instance having a plurality of attributes corresponding to the infrastructure device, the operation instance comprising requested units that indicate an amount of a physical resource needed in anticipation of an infrastructure device operation to be performed by the infrastructure device; communicate operation instructions to one or more additional infrastructure devices for an amount of units of the physical resource to be generated and an amount of units of the physical resource to be reserved based on the generated operation instance and a threshold reserve of the physical resource to ensure proper operation of the infrastructure; determine an amount of allocated units of the physical resource to the infrastructure device for the infrastructure device operation based in part on the generated operation instance and an amount of units of the physical resource that is being generated and the amount of units of the physical resource that is reserved by the one or more additional infrastructure devices; and communicate operation instructions to the infrastructure device to begin the infrastructure device operation, thereby consuming the amount of allocated units of the physical resource with the infrastructure device. - View Dependent Claims (2, 3, 4, 5, 6, 7)
-
8. A computer-implemented method for infrastructure resource management in a datacenter, the method comprising:
-
receiving infrastructure device data from an infrastructure device configured to consume a physical resource in the datacenter; generating, based on the infrastructure device data, an operation instance having a plurality of attributes corresponding to the infrastructure device, the operation instance comprising requested units that indicate an amount of a physical resource needed in anticipation of an infrastructure device operation to be performed by the infrastructure device; communicating operation instructions to one or more additional infrastructure devices an amount of units of the physical resource to be generated and an amount of units of the physical resource to be reserved, based on the generated operation instance and a threshold reserve of the physical resource associated with operating the one or more additional infrastructure devices in the datacenter; determine an amount of allocated units of the physical resources to the infrastructure device based in part on the generated operation instance and an amount of units of the physical resource that is being generated and the amount of units of the physical resource that is reserved; and communicating operation instructions to the infrastructure device to begin the infrastructure device operation, thereby consuming the amount of allocated units of the physical resource with the infrastructure device. - View Dependent Claims (9, 10, 11, 12, 13, 14, 15)
-
-
16. A method for infrastructure management in a datacenter, the method comprising:
-
communicating, from an infrastructure device, infrastructure device data to a computing device that generates operation instances having a plurality of attributes associated with the infrastructure device, the operation instance comprising a number of requested physical resource units that indicate an amount of a physical resource needed in anticipation of an infrastructure device operation by the infrastructure device; receiving, from the computing device, an amount of allocated units of the requested physical resource for the infrastructure device operation, wherein the amount of allocated units are generated based in part on the operation instance and an amount of units of the physical resource that is being generated and the amount of units of the physical resource that is reserved to ensure proper operation of the datacenter;
communicating a notification to actuate one or more physical devices within an operating infrastructure of the datacenter that is the operating environment of the infrastructure device, to initiate operation processes for the processing the amount of allocated units of the physical resource andconsuming, at the infrastructure device, the amount of allocated units of the physical resource for performing the infrastructure device operation, wherein the physical resource is selected from one of power, water, carbon dioxide, or heat. - View Dependent Claims (17, 18, 19)
-
Specification