×

Work information modelling

  • US 10,423,905 B2
  • Filed: 02/03/2016
  • Issued: 09/24/2019
  • Est. Priority Date: 02/04/2015
  • Status: Active Grant
First Claim
Patent Images

1. A method for an automated construction data interchange in a work information modelling system, withat least one server means, storing a general construction database, the database comprising:

  • structured datasets of a plurality of object entities of physical construction components, wherein the datasets comprise CAD information and attribute information of the object entities, witha hierarchical structure of the object entities representing a desired construction result to be established by the physical construction components anda mobile client device for a mobile executing entity with a variable place of action, built for establishing a communication link to the server means;

    the method comprising;

    surveying on-site spatial location information of the executing entity at its place of action by location tracking of the executing entity with a location tracking system at the mobile client device,computing an automatic filtering and preparing of a specific on-site task information with respect to a required handling sequence of one or more of the physical construction components by the executing entity to establish the desired construction result with a filtering unit, wherein the automatic filtering is based on;

    a reading of an identifier associated with the executing entity and role associated to the executing entity,the surveying of the on-site spatial location information of the executing entity,accessing the structured datasets and the hierarchical structure, andreading an actual time information that is synchronized with the server means; and

    providing the specific on-site task information for handling the physical construction components to the executing entity via the mobile client device, with a dynamic updating of the construction database and the specific on-site task information, andhandling the physical construction components by the executing entity according to the specific on-site task information,wherein the communication link between mobile client device and the server means is at least occasionally offline, and wherein the filtering is done with;

    a pre-work online communication during which one or more of the specific task information are downloaded and locally stored at the mobile client device for offline access,an at least occasionally offline working of the executing entity on his specific task information, wherein resulting information of the specific task information is locally buffered by the mobile client device, andan uploading of the buffered resulting information upon establishing a post-work online communication to the server means; and

    wherein a tool of the executive entity is automatically controlled and configured in real time based on the specific on-site task information at the tools on-site spatial location.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×