Power connection control system and method
First Claim
1. An outage management apparatus comprising:
- a processing section that schedules time to establish linkage for every unit of energy provision equipment to an electric power system based on at least either a linkage operation time, which is received from the unit of energy provision equipment, representing a time period from connecting the unit of energy provision equipment to the electric power system to enable a linkage operation of the unit of energy provision equipment with the electric power system or a predicted amount of reverse power flow, which is received from the unit of energy provision equipment, representing an amount of electric power of a reverse power flow from the unit of energy provision equipment to the electric power system, at a time of restoration from a power outage; and
a communication section that transmits a linkage command, for linking the unit of energy provision equipment to the electric power system, to each unit of energy provision equipment according to the scheduled time to establish linkage, whereinsaid processing section schedules a time to establish linkage for every unit of energy provision equipment so that an amount of adjustment of electric power generated by an adjusting power source of the electric power system is minimized.
0 Assignments
0 Petitions
Accused Products
Abstract
For each of consumers, a connection control apparatus is provided that includes an opening/closing device capable of connecting or disconnecting an electric power system and a consumer, that, when a power outage occurs in the electric power system, disconnects the electric power system and the consumer from each other by the opening/closing device at a command from an outage management apparatus or the like, and that connects the electric power system and the consumer to each other by the opening/closing device upon receiving a command from the outage management apparatus or the like at the time of restoration from the power outage. A power supply control apparatus supplies electric power from energy provision equipment to electrical appliances during a power outage in the electric power system.
-
Citations
3 Claims
-
1. An outage management apparatus comprising:
-
a processing section that schedules time to establish linkage for every unit of energy provision equipment to an electric power system based on at least either a linkage operation time, which is received from the unit of energy provision equipment, representing a time period from connecting the unit of energy provision equipment to the electric power system to enable a linkage operation of the unit of energy provision equipment with the electric power system or a predicted amount of reverse power flow, which is received from the unit of energy provision equipment, representing an amount of electric power of a reverse power flow from the unit of energy provision equipment to the electric power system, at a time of restoration from a power outage; and a communication section that transmits a linkage command, for linking the unit of energy provision equipment to the electric power system, to each unit of energy provision equipment according to the scheduled time to establish linkage, wherein said processing section schedules a time to establish linkage for every unit of energy provision equipment so that an amount of adjustment of electric power generated by an adjusting power source of the electric power system is minimized. - View Dependent Claims (2, 3)
-
Specification