Mechanical downhole pressure maintenance system
First Claim
1. A completion assembly comprising:
- an elongated base pipe having an external surface at least partially defining an external region and an internal surface at least partially defining an internal region; and
a pressure maintenance device disposed in the base pipe and comprising;
a flow path that extends between the internal region and the external region;
a valve that allows the flow of a fluid from the internal region to the external region through the flow path when a pressure differential between the internal region and the external is less than a maximum pressure threshold.
1 Assignment
0 Petitions
Accused Products
Abstract
A method and apparatus that includes an elongated base pipe having an external surface at least partially defining an external region and an internal surface at least partially defining an internal region; and a pressure maintenance device disposed in the base pipe and comprising: a flow path that extends between the internal region and the external region; and a valve having a gas charged chamber, the valve allowing the flow of a fluid from the internal region to the external region through the first flow path when a pressure differential between a pressure associated with the internal region and a pressure associated with the gas charged chamber is less than a maximum pressure threshold and when a pressure differential between the external region and the pressure associated with the gas charged chamber is greater than a minimum pressure threshold.
9 Citations
18 Claims
-
1. A completion assembly comprising:
-
an elongated base pipe having an external surface at least partially defining an external region and an internal surface at least partially defining an internal region; and a pressure maintenance device disposed in the base pipe and comprising; a flow path that extends between the internal region and the external region; a valve that allows the flow of a fluid from the internal region to the external region through the flow path when a pressure differential between the internal region and the external is less than a maximum pressure threshold. - View Dependent Claims (2, 3, 4)
-
-
5. A completion assembly comprising:
-
an elongated base pipe having an external surface at least partially defining an external region and an internal surface at least partially defining an internal region; and a pressure maintenance device disposed in the base pipe and comprising; a flow path that extends between the internal region and the external region; and a valve having a gas charged chamber, the valve allowing the flow of a fluid from the internal region to the external region through the first flow path when a pressure differential between a pressure associated with the internal region and a pressure associated with the gas charged chamber is less than a maximum pressure threshold and when a pressure differential between the external region and the pressure associated with the gas charged chamber is greater than a minimum pressure threshold. - View Dependent Claims (6, 7)
-
-
8. A method of pressure maintenance within a multi-production zone, the method comprising:
-
providing a first pressure maintenance device within a first zone along a completion string having an external surface at least partially defining an external region and an internal surface at least partially defining an internal region; isolating the external region of the first zone from a wellbore hydrostatic pressure; opening a first valve that controls the flow of a fluid from the internal region of the first zone to the external region of the first zone through a first fluid path that extends between the external region and the internal region to allow the fluid from the internal region of the first zone to flow to the external region of the first zone when a first pressure differential between a pressure within the external region of the first zone and a pressure within a first gas charged chamber within the first zone of the completion string is greater than a first minimum pressure threshold; and closing the first valve when the pressure differential between the pressure within the external region of the first zone and the pressure within the first gas charged chamber is less than or equal to the first minimum pressure threshold. - View Dependent Claims (9, 10, 11, 12)
-
-
13. A method of providing pressure maintenance in a multi-zone production zone:
-
positioning a completion string having an internal surface at least partially defining an internal region and an external surface at least partially defining an external region within a wellbore; isolating an external region of a first zone of the completion string from a wellbore hydrostatic pressure; isolating an external region of a second zone of the completion string from the wellbore hydrostatic pressure; maintaining a pressure within the external region of the first zone using a first pressure maintenance device within a first pressure range; and maintaining a pressure within the external region of the second zone using a second pressure maintenance device within a second pressure range. - View Dependent Claims (14, 15, 16, 17, 18)
-
Specification