Projection system and method for controlling projection system
First Claim
Patent Images
1. A projection system comprising:
- a first projector that projects an image based on image data in a first projection direction;
a second projector that projects an image based on image data in a second projection direction; and
a storage section that stores the image data representing the image projected by the first projector,wherein the image projected by the second projector is allowed to be switched to the image based on the image data stored in the storage section.
1 Assignment
0 Petitions
Accused Products
Abstract
A projection system includes a first projector that projects an image based on image data in a first projection direction, a second projector that projects an image based on image data in a second projection direction, and a storage section that stores the image data representing the image projected by the first projector. The projection system can switch the image projected by the second projector to the image based on the image data stored in the storage section.
-
Citations
12 Claims
-
1. A projection system comprising:
-
a first projector that projects an image based on image data in a first projection direction; a second projector that projects an image based on image data in a second projection direction; and a storage section that stores the image data representing the image projected by the first projector, wherein the image projected by the second projector is allowed to be switched to the image based on the image data stored in the storage section. - View Dependent Claims (2)
-
-
3. A projection system comprising:
-
a first projector including a first acquisition section that acquires image data, a first projection section that projects an image based on the image data acquired by the first acquisition section, a first storage section that stores the image data representing the image projected by the first projection section, and a first communication section that transmits the image data stored in the first storage section to the second projector; and a second projector including a second acquisition section that acquires image data, a second projection section that projects an image based on the image data acquired by the second acquisition section, a second communication section that receives the image data from the first projector, and a second storage section that stores the image data received by the second communication section, wherein the second projector can perform an action in which the second projection section projects the image based on the image data acquired by the second acquisition section and an action in which the second projection section projects the image based on the image data stored in the second storage section with the two actions switched from one to the other. - View Dependent Claims (4, 5, 6, 7, 8, 9, 10)
-
-
11. A method for controlling a projection system including a first projector that projects an image based on image data in a first projection direction and a second projector that projects an image based on image data in a second projection direction, the method comprising
storing the image data representing the image projected by the first projector and switching the image projected by the second projector to the image based on the stored image data.
-
12. A method for controlling a projection system including a first projector that projects an image based on image data in a first projection direction and a second projector that projects an image based on image data in a second projection direction, wherein
the first projector causes a first acquisition section to acquire image data, projects an image based on the image data acquired by the first acquisition section, stores the image data on the projected image, and transmits the stored image data to the second projector, and the second projector causes a second acquisition section to acquire image data, projects an image based on the image data acquired by the second acquisition section, and receives the image data from the first projector, stores the received image data, and performs an action of projecting the image based on the image data acquired by the second acquisition section and an action of projecting the image based on the stored image data with the two actions switched from one to the other.
Specification