Construction machine
First Claim
1. A construction machine comprising:
- a plurality of hydraulic pumps;
a first directional control valve that controls a flow of a hydraulic fluid from one of the hydraulic pumps to a first hydraulic actuator;
a pair of first solenoid proportional valves that generate and output pilot pressure for driving the first directional control valve;
a plurality of second directional control valves that control the flow of the hydraulic fluid from the plurality of hydraulic pumps to a second hydraulic actuator;
a plurality of pairs of second solenoid proportional valves that generate and output pilot pressures for driving the plurality of second directional control valves;
at least one electric lever-type operation device that outputs a first operation signal for operating the first hydraulic actuator and that outputs a second operation signal for operating the second hydraulic actuator; and
a controller that outputs a first command current for driving the first solenoid proportional valve in response to the first operation signal from the operation device, and that outputs a second command current for driving the second solenoid proportional valves in response to the second operation signal from the operation device, whereinthe controller includes a correction function to correct a command current in such a manner that the command current is higher than a target current corresponding to an operation amount of the operation device for preset predetermined time at a time of starting to operate the operation device from a neutral position of the operation device, andthe correction function of the controller corrects the command current such that the controller corrects the first command current and does not correct the second command current or such that a correction value of the first command current is higher than a correction value of the second command current.
1 Assignment
0 Petitions
Accused Products
Abstract
A construction machine that can ensure an initial response that varies in accordance with a hydraulic actuator in a similar fashion to a case of adopting a hydraulic pilot-type operation device is provided. A controller 100 of a hydraulic excavator outputs a command current for driving the corresponding solenoid proportional valve (i.e. some of solenoid proportional valves 41a, 41b, 42a to 42d, 43a to 43d, 44a and 44b) in response to an operation signal from an electric lever-type work operation device 2a or 2b, and includes a correction function to correct the command current such that the command current is higher than a target current corresponding to an operation amount of the operation device for preset predetermined time at a time of starting to operate the operation device from a neutral position thereof. This correction function corrects only the command current to the bucket solenoid proportional valves 44a and 44b.
-
Citations
4 Claims
-
1. A construction machine comprising:
-
a plurality of hydraulic pumps; a first directional control valve that controls a flow of a hydraulic fluid from one of the hydraulic pumps to a first hydraulic actuator; a pair of first solenoid proportional valves that generate and output pilot pressure for driving the first directional control valve; a plurality of second directional control valves that control the flow of the hydraulic fluid from the plurality of hydraulic pumps to a second hydraulic actuator; a plurality of pairs of second solenoid proportional valves that generate and output pilot pressures for driving the plurality of second directional control valves; at least one electric lever-type operation device that outputs a first operation signal for operating the first hydraulic actuator and that outputs a second operation signal for operating the second hydraulic actuator; and a controller that outputs a first command current for driving the first solenoid proportional valve in response to the first operation signal from the operation device, and that outputs a second command current for driving the second solenoid proportional valves in response to the second operation signal from the operation device, wherein the controller includes a correction function to correct a command current in such a manner that the command current is higher than a target current corresponding to an operation amount of the operation device for preset predetermined time at a time of starting to operate the operation device from a neutral position of the operation device, and the correction function of the controller corrects the command current such that the controller corrects the first command current and does not correct the second command current or such that a correction value of the first command current is higher than a correction value of the second command current. - View Dependent Claims (2, 3, 4)
-
Specification