Method for evaluating operational and financial performance for dispatchers using after the fact analysis
First Claim
1. A method, comprising:
- receiving, by a system comprising a processor, individual operating plans having different scheduling intervals, and wherein at least one of the individual operating plans comprises a constraint defining fuel consumption reserved for at least one future scheduling interval of the different scheduling intervals for use by power generation system resources of a power generation system for generation of electrical power in a power grid;
generating, by the system, a comprehensive operating plan from the individual operating plans and the constraint defining the fuel consumption reserved for the at least one future scheduling interval for the generation of the electrical power by the power generation system resources;
capturing, by the system, conditions of the power generation system associated with execution of the comprehensive operating plan during the generation of the electrical power by the power generation system resources;
analyzing, by the system, a criterion associated with the execution of the comprehensive operating plan against a use-case based on the conditions of the power generation system;
modifying, by the system, the comprehensive operating plan based on a result of the analyzing and the constraint defining the fuel consumption reserved for the at least one future scheduling interval for the generation of the electrical power by the power generation system resources, resulting in a modified comprehensive operating plan; and
controlling, by the processor, the power generation system to dispatch the power generation system resources according to the modified comprehensive operating plan to generate the electrical power.
2 Assignments
0 Petitions
Accused Products
Abstract
A method is provided for evaluating operational and financial performance for dispatchers in power grid control centers associated with utility systems. A comprehensive operating plan is provided that applies after the fact analysis for performance metrics, root-cause impacts and process re-engineering. after the fact analysis of past events and practices is performed. Actual system and resource conditions are captured. the system and resource conditions are supplied to a relational database. A scheduler engine receives the actual system and resource conditions from the relational database and processes it to calculate system performance. At least one of the following is displayed, transmission evaluation application displays, reference and scenario cases and associations between them, results presented with a graphical or tabular displays, comparison results between scenario cases and a reference case, a family of curves where each curve is a performance metric, comparison of scenario input data, study results and statistical analysis and historical data.
-
Citations
20 Claims
-
1. A method, comprising:
-
receiving, by a system comprising a processor, individual operating plans having different scheduling intervals, and wherein at least one of the individual operating plans comprises a constraint defining fuel consumption reserved for at least one future scheduling interval of the different scheduling intervals for use by power generation system resources of a power generation system for generation of electrical power in a power grid; generating, by the system, a comprehensive operating plan from the individual operating plans and the constraint defining the fuel consumption reserved for the at least one future scheduling interval for the generation of the electrical power by the power generation system resources; capturing, by the system, conditions of the power generation system associated with execution of the comprehensive operating plan during the generation of the electrical power by the power generation system resources; analyzing, by the system, a criterion associated with the execution of the comprehensive operating plan against a use-case based on the conditions of the power generation system; modifying, by the system, the comprehensive operating plan based on a result of the analyzing and the constraint defining the fuel consumption reserved for the at least one future scheduling interval for the generation of the electrical power by the power generation system resources, resulting in a modified comprehensive operating plan; and controlling, by the processor, the power generation system to dispatch the power generation system resources according to the modified comprehensive operating plan to generate the electrical power. - View Dependent Claims (2, 3, 4, 5, 6, 7)
-
-
8. A system, comprising:
-
a processor; and a memory communicatively coupled to the processor, the memory having stored therein computer-executable instructions, comprising; a general control application that; receives a plurality of individual operating plans having different scheduling intervals, and wherein at least one of the plurality of individual operating plans comprises a constraint defining fuel consumption reserved for at least one future scheduling interval of the different scheduling intervals for use by power generation system resources of a power generation system for generation of electrical power in a power grid; generates a comprehensive operating plan from the plurality of individual operating plans and the constraint defining the fuel consumption reserved for the at least one future scheduling interval for the generation of the electrical power by the power generation system resources; captures conditions of the power generation system associated with execution of the comprehensive operating plan during the generation of the electrical power by the power generation system resources; performs an analysis of a criterion associated with the execution of the comprehensive operating plan relative to a use-case based upon the conditions of the power generation system; modifies the comprehensive operating plan based upon a result of the analysis and the constraint defining the fuel consumption reserved for the at least one future scheduling interval for the generation of the electrical power by the power generation system resources, resulting in a modified comprehensive operating plan; and controls the power generation system to dispatch the power generation system resources according to the modified comprehensive operating plan to generate the electrical power. - View Dependent Claims (9, 10, 11, 12, 13, 14)
-
-
15. A non-transitory computer-readable medium having executable instructions stored thereon that, in response to execution, cause a system comprising a processor to perform operations, comprising:
-
receiving a group of individual operating plans having different scheduling intervals, and wherein an individual operating plan of the group of individual operating plans comprises a constraint defining fuel consumption reserved for at least one future scheduling interval of the different scheduling intervals for use by power generation system resources of a power generation system for generation of electrical power in a power grid; generating a comprehensive operating plan from the group of individual operating plans and the constrain defining the fuel consumption reserved for the at least one future scheduling interval for the generation of the electrical power by the power grid generation system resources; capturing conditions of the power generation system associated with execution of the comprehensive operating plan during the generation of the electrical power by the power generation system resources; analyzing a criterion associated with the execution of the comprehensive operating plan with respect to a use-case based up the conditions of the power generation system; modifying the comprehensive operating plan based up a result of the analyzing and the constraint defining the fuel consumption reserved for the at least one future scheduling interval for the generation of the electrical power by the power generation system resources, resulting in a modified comprehensive operating plan; and controlling the power generation system to dispatch the power generation system resources according to the modified comprehensive operating plan to generate the electrical power. - View Dependent Claims (16, 17, 18, 19, 20)
-
Specification