×

Integration of as built data of a project

  • US 10,460,267 B2
  • Filed: 11/29/2012
  • Issued: 10/29/2019
  • Est. Priority Date: 11/29/2011
  • Status: Active Grant
First Claim
Patent Images

1. A method for reporting as-built data of a project, the method comprising:

  • modifying a structure being constructed with a handheld power tool, wherein the structure is modified with the tool such that a non-blueprint compliant modification is generated, wherein the non-blueprint compliant modification is different from a corresponding plan of a blueprint of the structure;

    while modifying the structure, determining, with the handheld tool, as-built information characterizing the non-blueprint compliant modification, wherein the as-built characterizing information represents a characteristic of the modification as completed, wherein the characterizing information for the characteristic is different from characterizing information for the corresponding characteristic in the blueprint;

    recording at the handheld power tool, the as-built characterizing information;

    with the handheld power tool, determining a position of the non-blueprint compliant modification as completed;

    recording at the handheld power tool, the determined position;

    reporting the as-built characterizing information and the determined position via a wireless communication link of the handheld tool to an information management system remote from the handheld tool; and

    modifying a record of the project in a database stored at the information management system with the as-built characterizing information and the position.

View all claims
  • 2 Assignments
Timeline View
Assignment View
    ×
    ×