×

Adaptive power management of a cluster of host computers using predicted data

  • US 10,460,362 B2
  • Filed: 08/07/2018
  • Issued: 10/29/2019
  • Est. Priority Date: 08/24/2013
  • Status: Active Grant
First Claim
Patent Images

1. A method performed by a computing device, the method comprising:

  • generating predicted demand data for clients executed in a cluster of host computers, the predicted demand data based on observed resource demands of the clients;

    determining a host utilization setting to apply for a particular time period, the host utilization setting based on the predicted demand data; and

    causing, prior to the particular time period, a gradual adjustment from an initial host utilization setting to the host utilization setting, the gradual adjustment comprising at least one intermediate host utilization setting, wherein a host computer of the cluster performs one of;

    a power-down or a power-up based on the gradual adjustment.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×