×

Generating work products using work product metrics and predicted constituent availability

  • US 10,467,638 B2
  • Filed: 08/14/2014
  • Issued: 11/05/2019
  • Est. Priority Date: 08/14/2014
  • Status: Active Grant
First Claim
Patent Images

1. A method comprising:

  • predicting availability of a plurality of constituents for one or more future epochs, wherein predicting the availability of the plurality of constituents comprises;

    querying a knowledge database to obtain information associated with current availability of respective ones of the plurality of constituents for a current epoch and to receive information associated with historical availability of respective ones of the plurality of constituents for one or more previous epochs; and

    creating probability distributions of future availability of respective ones of the plurality of constituents for the one or more future epochs utilizing one or more constraints associated with supply chains of respective ones of the plurality of constituents and the received information associated with current and historical availability of respective ones of the plurality of constituents;

    obtaining one or more metrics for each of a plurality of existing work products, each of the plurality of existing work products using at least one of the plurality of constituents, wherein obtaining the one or more metrics comprises;

    querying the knowledge database to obtain information associated with the plurality of existing work products;

    utilizing the obtained information associated with the plurality of existing work products to determine, for respective ones of the existing work products, one or more novelty metrics and one or more quality metrics, the one or more novelty metrics comprising temporal novelty metrics associated with respective constituents, the novelty metric for a given constituent for a given future epoch being based on selection of the given constituent for one or more previous epochs; and

    generating at least one work product for each of the one or more future epochs based in part on the predicted availability of the constituents and the one or more metrics for the existing work products, wherein generating the at least one work product comprises;

    building an optimization model comprising two or more constraints, the two or more constraints comprising an availability-based constraint determined utilizing the predicted availability of the constituents and a creativity-based constraint determined using a computational creativity model that utilizes the quality metrics and novelty metrics associated with the existing work products to compute a creativity metric for respective ones of a plurality of candidate work products different from the existing work products in the knowledge database; and

    utilizing the optimization model to select the at least one work product for each of the one or more future epochs from the plurality of candidate work products;

    wherein the method is performed by at least one processing device comprising a processor coupled to a memory;

    wherein the creativity-based constraint is a function of;

    amounts of one or more constituents utilized in a given candidate work product;

    whether the given candidate work product is selected for a given epoch; and

    whether the given candidate work product is selected for two or more consecutive ones of the future epochs; and

    wherein the optimization model comprises an objective function that takes into account a transfer cost associated with producing the given candidate work product for the given epoch, the transfer cost being based at least in part on whether the given work product was selected for an epoch preceding the given epoch.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×