×

Method for charging a direct current traction battery at a direct current charging pillar

  • US 10,471,837 B2
  • Filed: 01/26/2016
  • Issued: 11/12/2019
  • Est. Priority Date: 01/28/2015
  • Status: Active Grant
First Claim
Patent Images

1. A method for charging an electric vehicle at a charging pillar with a first voltage level (Vin) of 400 V, comprising:

  • connecting the electric vehicle to the charging pillar, the electric vehicle comprising;

    an electric motor for driving the electric vehicle,a traction battery for feeding the electric motor, the traction battery having a second voltage level (Vout),a charging socket for receiving direct current voltage or alternating current voltage from the charging pillar,at least one on-board charging device for charging the traction battery at the second voltage level (Vout) if the charging socket receives alternating current voltage from the charging pillar,a high-voltage charge booster for charging the traction battery if the charging socket receives direct current voltage from the charging pillar, wherein the at least one on-board charging device and the high-voltage charge booster are coupled in parallel with each other between the charging socket and the traction battery, the high-voltage charge booster comprising;

    a converter for transforming the first voltage level (Vin) into the second voltage level (Vout) if the first voltage level (Vin) differs from the second voltage level (Vout) such that the traction battery is charged by the output of the converter, anda bypass for bypassing the converter if the first voltage level (Vin) corresponds to the second voltage level (Vout) such that the traction battery is charged directly from the charging pillar,an on-board computer connected by cable to the high-voltage charge booster,evaluating the operational capability of the high-voltage charge booster,detecting the first voltage level (Vin) for a given operational capability,initiating an exchange of information with the charging pillar for a detected first voltage level (Vin),transmitting charging-relevant information to the charging pillar,availability-testing a required power of the high-voltage charge booster,starting a charging process,connecting the power to the high-voltage charge booster,plausibility-checking a charging current flowing from the charging pillar,storing environmental data,monitoring the charging process, andending the charging process.

View all claims
  • 2 Assignments
Timeline View
Assignment View
    ×
    ×