×

Optimization of cold starts in thermal power stations, in particular in steam-electric power plants or in combined cycle power plants (CCPPS)

  • US 10,487,746 B2
  • Filed: 04/01/2014
  • Issued: 11/26/2019
  • Est. Priority Date: 04/04/2013
  • Status: Active Grant
First Claim
Patent Images

1. A thermal power plant, comprisingan additional thermal energy storage device that is intrinsically in the thermal power plant and is adapted to supply energy during starting up of the thermal power plant,wherein the additional thermal energy storage device is a tank or a boiler adapted to be filled with a process gas of the thermal power plant during an operation of the thermal power plant;

  • an air inlet;

    a crossflow heat exchanger that is in fluid communication with the air inlet,wherein the process gas of the thermal power plant is steam,wherein the additional thermal energy storage device is adapted to provide the process gas to the crossflow heat exchanger during the starting up of the thermal power plant to heat a stream of inlet air flowing through the air inlet and the crossflow heat exchanger;

    a waste-heat boiler,wherein the additional thermal energy storage device is adapted to provide the process gas to the waste-heat boiler during the starting up of the thermal power plant;

    a steam turbine,wherein the additional thermal energy storage device is coupled to the steam turbine by a control bleed,wherein the additional thermal energy storage device is adapted to provide the process gas to the steam turbine during the starting up of the thermal power plant,wherein the control bleed is adapted to bleed off the steam of the steam turbine to fill the additional thermal energy storage device during the operation of the thermal power plant,an additional electrical, chemical or mechanical energy storage device that is intrinsically in the thermal power plant and is adapted to supply energy during the starting up of the thermal power plant for feeding into an electrical energy distribution network.

View all claims
  • 2 Assignments
Timeline View
Assignment View
    ×
    ×