Systems and methods for utilization of demand side assets for provision of grid services

  • US 10,491,000 B2
  • Filed: 02/12/2016
  • Issued: 11/26/2019
  • Est. Priority Date: 02/12/2015
  • Status: Active Grant
First Claim
Patent Images

1. A method for regulating the electrical grids and grid-connected devices comprising the following steps:

  • providing a grid operations center server, having a memory containing instructions which, when executed by a processor cause the processor to;

    determine the levels of grid services needed from available demand response and distributed energy resources (DR-DER) assets for each time interval increment in the operations planning time horizon;

    determine the available capacities and virtual power plant (VPP) costs for each time interval increment;

    send a determined capability commitment for grid services to a grid services optimization processor for each time interval increment;

    the grid services optimization processor configured to determine the required grid services from each VPP for each time interval;

    a grid services management server allocates the grid services assigned to each VPP to individual load control switches and intelligent controllers using secure data communications channels, so that thresholds are output to simple load switches, and thresholds and trigger set-points are downloaded to switches and local controllers for complex loads and distributed storage and generation.

View all claims