×

Control of preparatory measures in a vehicle

  • US 10,495,013 B2
  • Filed: 06/16/2015
  • Issued: 12/03/2019
  • Est. Priority Date: 07/07/2014
  • Status: Active Grant
First Claim
Patent Images

1. A method for control of preparatory measures associated with entering a part of a road section for at least one system in a vehicle, said method comprising:

  • identification of one or several parts of a road section, when one or several engines comprised in said vehicle may be shut down while said vehicle is coasting in said road section, wherein said identification of said part of the road section is carried out when said part of the road section is ahead of said vehicle, and wherein said identification is based on information about said part of the road section, wherein said information about said road section is determined based on information from one or more sources selected from the group of;

    map data in combination with positioning information;

    positioning information stored previously in the vehicle;

    radar-based information;

    camera-based information;

    information obtained from another vehicle than said vehicle; and

    information obtained from traffic systems relating to said road section;

    determination of whether at least one preparatory measure for at least one respective system needs to be carried out before entering the road section where shutdown of said one or several engines occurs, wherein at least one of a charging status of batteries, temperatures of different systems in the vehicle, or pneumatic or hydraulic pressure in systems in the vehicle is analyzed to determine if at least one preparatory measure needs to be carried out or not before entering the road section; and

    control of said at least one preparatory measure initiated before entering the road section, based on said determination of the need to carry out said at least one preparatory measure, so that the one or several engines comprised in said vehicle may be shut down, while said vehicle is coasting in said road section.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×