×

Process improvement through the addition of power recovery turbine equipment in existing processes

  • US 10,508,568 B2
  • Filed: 03/16/2018
  • Issued: 12/17/2019
  • Est. Priority Date: 03/16/2018
  • Status: Active Grant
First Claim
Patent Images

1. A process for recovering energy in a petroleum, petrochemical, or chemical plant comprising:

  • identifying a first fluid stream having a first control valve thereon in a process zone;

    installing a first power-recovery turbine at the location of the first control valve;

    directing at least a portion of the first fluid stream through the first power-recovery turbine to generate electric power therefrom; and

    recovering the electric power.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×