Railway turnout control method and system
First Claim
Patent Images
1. A railway turnout control method, comprising:
- constructing a data space corresponding to a railway turnout area;
adding a virtual railway turnout, in the data space, to a virtual space corresponding to a turnback area in which a target turnback stopping point is located;
adding the virtual railway turnout to a railway turnout list corresponding to a route along which a train drives into the turnback area; and
maintaining claim of the virtual railway turnout when the train stops at the target turnback stopping point.
1 Assignment
0 Petitions
Accused Products
Abstract
A railway turnout control method comprises: constructing a data space corresponding to a railway turnout area (101); adding a virtual railway turnout, in the data space, to an area in which a target turnback stopping point is located (102); adding the virtual railway turnout to a railway turnout list corresponding to a route along which a train drives into the area (103); and not releasing claim of the virtual railway turnout when the train stops at the turnback stopping point (104); Also provided is a railway turnout control system. The method and system can solve problems of deadlock of a turnback area and insufficient safety protection of crossed routes.
6 Citations
13 Claims
-
1. A railway turnout control method, comprising:
-
constructing a data space corresponding to a railway turnout area; adding a virtual railway turnout, in the data space, to a virtual space corresponding to a turnback area in which a target turnback stopping point is located; adding the virtual railway turnout to a railway turnout list corresponding to a route along which a train drives into the turnback area; and maintaining claim of the virtual railway turnout when the train stops at the target turnback stopping point. - View Dependent Claims (2, 3, 4, 5, 6)
-
-
7. A railway turnout control method related to crossed routes, comprising:
-
constructing a data space corresponding to a railway turnout area; adding to the data space a virtual railway turnout at a virtual location corresponding to a junction of the crossed routes; and adding the virtual railway turnout to each railway turnout list corresponding to each route passing through the junction. - View Dependent Claims (8, 9)
-
-
10. A railway turnout control system, comprising:
-
a construction unit, configured to construct a data space corresponding to a railway turnout area; an addition unit, configured to add a virtual railway turnout, in the data space, to a virtual space corresponding to a turnback area in which a target turnback stopping point is located; and a management unit, configured to add the virtual railway turnout to a railway turnout list corresponding to a route along which a train drives into the turnback area, and maintain claim of the virtual railway turnout when the train stops at the turnback stopping point. - View Dependent Claims (11, 12, 13)
-
Specification