Methods and systems for integration of industrial site efficiency losses to produce LNG and/or LIN

  • US 10,563,914 B2
  • Filed: 08/05/2016
  • Issued: 02/18/2020
  • Est. Priority Date: 08/06/2015
  • Status: Active Grant
First Claim
Patent Images

1. A method comprising:

  • receiving one or more inputs corresponding to a proposed configuration of a liquefaction facility, wherein the proposed configuration identifies a plurality of components utilized to produce liquefied natural gas (LNG) and/or liquid nitrogen (LIN) at the liquefaction facility when configured according to the proposed configuration;

    determining an alternative configuration of the liquefaction facility, wherein the alternative configuration is different from the proposed configuration, and wherein determining the alternative configuration includes;

    identifying one or more candidate locations for the liquefaction facility;

    identifying resources accessible to each of the one or more candidate locations, wherein the identified resources are accessible from at least one source external to the liquefaction facility, and wherein the identified resources are utilized by the liquefaction facility to produce the LNG and/or the LIN;

    determining whether at least one identified resource of the resources accessible to the one or more candidate locations corresponds to a resource used during production of the LNG and/or the LIN at the liquefaction facility using the proposed configuration; and

    determining, based at least in part on the identified resources accessible to the one or more candidate locations, whether to omit or reduce a size of at least one component of the plurality of components identified by the proposed configuration; and

    omitting or reducing the size of the at least one component of the alternative configuration of the liquefaction facility in response to a determination that the at least one identified resource corresponds to the resource generated by the at least one component;

    generating a report based on the proposed configuration and the alternative configuration, wherein the report includes information indicating a difference between the proposed configuration and the alternative configuration; and

    constructing the liquefaction facility according to the alternative configuration included in the report, wherein the liquefaction facility constructed according to the alternative configuration is configured to provide refrigeration capacity for producing the LNG and/or the LIN via letdown of one or more resources accessible to a location of the liquefaction facility, and wherein at least a portion of the resources letdown by the liquefaction facility is provided to a facility external to the liquefaction facility at a pressure that is lower than a pressure for which the resources are available to the external facility via other sources.

View all claims