Methods and apparatuses for risk assessment and insuring intermittent electrical systems
First Claim
1. A method of insuring an intermittent generator of a customer at a customer site, the method comprising:
- configuring a computer to monitor a metered load at the site;
configuring the computer to monitor generation output of the intermittent generator;
determining a consumption distribution curve of the load using the metered load monitored by the computer;
determining a production distribution curve of the intermittent generator using generation output monitored by the computer;
generating a net demand distribution curve using a computer-assisted simulation that accesses the consumption distribution curve and the production distribution curve;
referencing the net demand distribution curve to determine a risk of the intermittent generator failing to provide a threshold amount of power to the site;
insuring the customer against the intermittent generator failing to provide the threshold amount of power to the site;
determining a failure of the intermittent generator to provide the threshold amount of power;
determining that a peak demand charge will be assessed in response to the failure of the intermittent generator;
paying at least a portion of the peak demand charge on behalf of the customer.
1 Assignment
0 Petitions
Accused Products
Abstract
Methods and systems for generating a probability assessment for peak demand reduction for utility customers using a conditional-output energy generator are described. One method includes providing a customer data set and one or more historical generator production data sets for one or more intermittent generators that meteorologically correspond with the customer data set. Time intervals are defined in the data sets and a production distribution curve is generated for each time interval. A simulation is performed using the historical customer consumption data and the production distribution curves to obtain a net demand distribution curve for each time interval. These methods and systems may provide probability-based economic evaluation of consumption management systems.
-
Citations
15 Claims
-
1. A method of insuring an intermittent generator of a customer at a customer site, the method comprising:
-
configuring a computer to monitor a metered load at the site; configuring the computer to monitor generation output of the intermittent generator; determining a consumption distribution curve of the load using the metered load monitored by the computer; determining a production distribution curve of the intermittent generator using generation output monitored by the computer; generating a net demand distribution curve using a computer-assisted simulation that accesses the consumption distribution curve and the production distribution curve; referencing the net demand distribution curve to determine a risk of the intermittent generator failing to provide a threshold amount of power to the site; insuring the customer against the intermittent generator failing to provide the threshold amount of power to the site; determining a failure of the intermittent generator to provide the threshold amount of power; determining that a peak demand charge will be assessed in response to the failure of the intermittent generator; paying at least a portion of the peak demand charge on behalf of the customer. - View Dependent Claims (2, 3, 4, 5)
-
-
6. A computing device configured for insuring an intermittent generator of a customer at a customer site, the computing device comprising:
-
a processor configured to monitor a metered load at the site; a processor configured to monitor output of an intermittent generator at the site; memory in electronic communication with the processor, wherein the memory stores computer executable instructions that, when executed by the processor, cause the processor to perform the steps of; determining a consumption distribution curve using the processor; determining a production distribution curve of the intermittent generator using the processor; generating a net demand distribution curve using a computer-assisted simulation that accesses the consumption distribution curve and the production distribution curve; referencing the net demand distribution curve to determine a risk of the intermittent generator failing to provide a threshold amount of power to the site; insuring the customer against the intermittent generator failing to provide the threshold amount of power to the site; determining a failure of the intermittent generator to provide the threshold amount of power; determining that a peak demand charge will be assessed in response to the failure of the intermittent generator; paying at least a portion of the peak demand charge on behalf of the customer. - View Dependent Claims (7, 8, 9, 10)
-
-
11. A non-transitory computer-readable storage medium storing computer executable instructions that, when executed by a processor, cause the processor to perform the steps of:
-
determining a consumption distribution curve using the processor; determining a production distribution curve of the intermittent generator; generating a net demand distribution curve using a computer-assisted simulation that accesses the consumption distribution curve and the production distribution curve; referencing the net demand distribution curve to determine a risk of the intermittent generator failing to provide a threshold amount of power to the site; insuring the customer against the intermittent generator failing to provide the threshold amount of power to the site; determining a failure of the intermittent generator to provide the threshold amount of power; determining that a peak demand charge will be assessed in response to the failure of the intermittent generator; paying at least a portion of the peak demand charge on behalf of the customer. - View Dependent Claims (12, 13, 14, 15)
-
Specification