×

Systems and methods for analyzing resource production

  • US 10,607,170 B1
  • Filed: 02/24/2016
  • Issued: 03/31/2020
  • Est. Priority Date: 06/08/2015
  • Status: Active Grant
First Claim
Patent Images

1. A method of producing fluids from a geological structure, the method comprising:

  • receiving field information associated with producing wells in a field, the field having field characteristics including geological, geophysical, petrophysical, lithological, and mineralogical characteristics, a first portion of the field information being received in a form of structured data, and a second portion of the field information being received in a form of unstructured data;

    transforming the unstructured data into transformed structured data;

    based on the received field information in the form of the structured data and the transformed structured data, building a plurality of field-specific models, each of the plurality of field-specific models being specific to the field characteristics of the field;

    selecting one of the plurality of field-specific models, the selected field-specific model including a proximity depletion synthetic variable and a fracturing (frac) hit synthetic variable;

    iteratively identifying, based on the selected field-specific model and using a field management engine, two or more proposed locations for a proposed well;

    for each of the two or more proposed locations for the proposed well;

    projecting, based on the selected field-specific model and using the field management engine, a decrease in production from one or more of the producing wells located proximal to the respective proposed location; and

    projecting, based on the selected field-specific model and using the field management engine, a production amount associated with a well drilled at the respective proposed location;

    selecting, using the field management engine, one of the two or more proposed locations for the proposed well, the selected location for the proposed well having the projected production amount that exceeds the projected decrease in production; and

    drilling the proposed well at the selected location.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×