Method of power management in pile foundation having a base machine and an attachment installed thereat

  • US 10,704,219 B2
  • Filed: 02/26/2019
  • Issued: 07/07/2020
  • Est. Priority Date: 02/26/2018
  • Status: Active Grant
First Claim
Patent Images

1. A method of power management during preparation of a pile having a base machine for excavating a borehole and an attachment installed at the base machine for a simultaneous introduction of a casing into a ground, wherein an energy supply for the attachment is at least partially provided by the base machine, the method comprising:

  • stepwise or continuously regulating, with a control of the base machine, energy flow from the base machine to the attachment including increasing energy supply to the attachment and decreasing energy supply to the base machine when a required excavation energy is low.