×

Power converter with improved load transient response and associated control method

  • US 10,727,742 B2
  • Filed: 10/16/2018
  • Issued: 07/28/2020
  • Est. Priority Date: 10/16/2017
  • Status: Active Grant
First Claim
Patent Images

1. A load transient enhancing module for a power converter having a main switch and a secondary switch, comprising:

  • a first input terminal, configured to receive a secondary switch control signal, wherein the secondary switch control signal is used to control on and off switching of the secondary switch;

    a second input terminal, configured to receive a load transient indication signal, wherein the load transient indication signal indicates whether a transient change is occurring in a load of the power converter; and

    an output terminal, configured to provide a load transient enhancing signal;

    wherein the load transient enhancing module is configured to generate the load transient enhancing signal at least based on the secondary switch control signal and the load transient indication signal; and

    wherein when the load transient indication signal indicates that a transient change is occurring, the load transient enhancing module is configured to disable the secondary switch control signal and to set the load transient enhancing signal to turn off the secondary switch and lock the secondary switch at “

    OFF”

    state so that a body diode of the secondary switch is turned on; and

    wherein the load transient enhancing module further comprises a third input terminal, configured to receive a main switch control signal, and wherein the main switch control signal is logically complementary with the secondary switch control signal and is used to control on and off switching of the main switch; and

    wherein when the load transient indication signal indicates that no transient change is occurring as well as the main switch control signal changes to a logic state that drives the main switch on, the load transient enhancing module is configured to enable the secondary switch control signal, and to synchronize the load transient enhancing signal with the secondary switch control signal.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×