×

Iterative drilling simulation process for enhanced economic decision making

  • US 20010042642A1
  • Filed: 03/28/2001
  • Published: 11/22/2001
  • Est. Priority Date: 03/25/1996
  • Status: Active Grant
First Claim
Patent Images

1. An iterative drilling simulation method for enhanced economic decision making comprising:

  • obtaining characteristics of a rock column in a formation to be drilled;

    specifying characteristics of at least one drilling rig system; and

    iteratively simulating the drilling of a well bore in the formation and producing an economic evaluation factor for each iteration of drilling simulation, wherein each iteration of drilling simulation is a function of the rock column and the characteristics of the at least one drilling rig system according to a prescribed drilling simulation model.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×