Method and system for enterprise wide production scheduling
First Claim
Patent Images
1. A computer implemented method for planning comprising:
- defining one or more work card templates;
receiving a plurality of operational work cards;
comparing the operational work cards with the work card template;
adding schedule parameters to the operational work cards that match the work cards template;
adding expected non-routine work cards to the operational work cards;
scheduling the expected non-routing work cards and the operational work cards;
receiving completed, suspended, modified, or non-routine work cards;
removing the completed work cards from an active work card schedule displaying each work card for a work order graphically with a task bar representing each work card;
storing multiple work cards configuration in a first stack;
storing multiple work cards configuration in a second stack; and
comparing any configuration in the first stack with any configuration in a second stack;
using a critical path method to determine an overall plan.
1 Assignment
0 Petitions
Accused Products
Abstract
A computer implemented method and system for enterprise wide planning is disclosed. In an embodiment, one or more work card templates are initially defined. Then a plurality of work cards representing a project are received and compared with the work card templates. Scheduling parameters from the work card templates are added to the matching work cards. Then, expected non-routine work cards are added to the work cards. Next, the expected non-routing work cards and the operational work cards are scheduled.
-
Citations
1 Claim
-
1. A computer implemented method for planning comprising:
-
defining one or more work card templates;
receiving a plurality of operational work cards;
comparing the operational work cards with the work card template;
adding schedule parameters to the operational work cards that match the work cards template;
adding expected non-routine work cards to the operational work cards;
scheduling the expected non-routing work cards and the operational work cards;
receiving completed, suspended, modified, or non-routine work cards;
removing the completed work cards from an active work card schedule displaying each work card for a work order graphically with a task bar representing each work card;
storing multiple work cards configuration in a first stack;
storing multiple work cards configuration in a second stack; and
comparing any configuration in the first stack with any configuration in a second stack;
using a critical path method to determine an overall plan.
-